Skip to main content

Potain’s new tower crane for global markets

Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate. Featuring new technology, the crane is said to combine the advantages of Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane
May 16, 2018 Read time: 3 mins
The new Potain MCH 125 tower crane is said to be easy and quick to erect
Potain is launching its first hydraulic topless luffing jib crane, following tests on site with select dealers in Thailand, Australia and New Zealand. It is the first topless luffing jib model from Potain and its novel hydraulic technology is said to make it easier to assemble and faster to operate.


Featuring new technology, the crane is said to combine the advantages of 5916 Potain’s MCR luffing jib cranes and MCT topless cranes. The machine is said to be straightforward to assemble and disassemble the crane on congested sites, suiting it to urban projects or job sites where space is limited.

Maximum capacity for the MCH 125 is 8tonnes, while the maximum jib length is 50m. Tip capacity is 2tonnes and maximum line speed is 100m/min when fitted with the 60 LVF 20 hoist. The crane’s design offers a number of advantages, including fast erection and dismantling. The topless design means less space is needed on site, as there is no cathead to assemble at ground level before installation.

The crane also uses Potain’s VVH hydraulic luffing technology for vertical movement of the jib, which eliminates the need for luffing wire ropes. With VVH technology, the MCH 125 is able to raise from a horizontal level to 87˚ in less than 2 minutes. The hydraulics are pre-connected at the factory, avoiding the need to perform this duty during on-site assembly.

The hydraulic luffing design means the crane has a shorter counter-jib and out-of-service radius when compared with rope-luffing alternatives, freeing up valuable space on congested job sites. The upperworks of the crane, including its full 50m of jib, can travel on just four trucks. Assembly to a height of 40m can be achieved in less than 6 hours.

Operation is said to be smooth and quiet; and for better utilisation for fleet owners it can be mounted on existing 1.6m or 2m mast sections from the manufacturer’s current range. Jib sections are from the MCR range of luffing jib cranes. There are five jib configurations available, ranging from 30m to 50m, in 5m increments.

The MCH 125 will be sold and supported through the extensive regional Potain dealer networks. The crane is available for sale throughout Asia, Africa, Oceania, the Middle East, Russia, the CIS countries and Latin America.

For more information on companies in this article

Related Content

  • Smart excavators coming to market
    March 23, 2021
    New excavators coming to market offer a combination of increased performance and smart technology
  • Concrete mixing technology offers advanced recipes
    February 13, 2012
    Modern concrete production plants are using technology to offer more sophisticated mix recipes as Patrick Smith reports. The growing trend towards ever more sophisticated concrete recipes calls for fully developed mixing technology. Companies are responding to the challenges with equipment that offers new levels of sophistication including computer controls and units that can deliver a huge variety of mix recipes.
  • Busy bridge in Beijing replaced quickly
    March 31, 2016
    The replacement of a very busy road bridge in China’s capital Beijing has been carried out successfully. Due to the volume of traffic using the bridge during week days, the work had to be carried out quickly so as to minimise traffic disruption. But despite being carried out in the centre of Beijing, the replacement work for the Sanyuan Bridge just took 43 hours from start to completion.
  • Complete control of machines using technology
    December 12, 2019
    Sophisticated machine control technology has been utilised on heavy equipment to help deliver a challenging project in New Zealand