Skip to main content

Pilosio’s an MP tower of strength

Pilosio has supplied a set of 18 MP high-capacity towers for the construction of a viaduct on the Bellinzona-Lugano section of the new trans-Alpine railway, due for completion by the end of 2014. The viaduct is divided into five sectors of varying distances, from 110m for the first to 100 for the second. Both were due to be completed this month. The third and fourth sectors will be 90m long, while the fifth will span 45m – forming a flyover across Strada Cantonale, which links Locarno and Bellinzona.
July 1, 2013 Read time: 2 mins
A set of 18MP high-capacity towers from Pilosio are said to be saving vital time in the construction of a viaduct on the new trans-Alpine railway
7163 Pilosio has supplied a set of 18 MP high-capacity towers for the construction of a viaduct on the Bellinzona-Lugano section of the new trans-Alpine railway, due for completion by the end of 2014.

The viaduct is divided into five sectors of varying distances, from 110m for the first to 100 for the second. Both were due to be completed this month. The third and fourth sectors will be 90m long, while the fifth will span 45m – forming a flyover across Strada Cantonale, which links Locarno and Bellinzona.

Project client the MPC Consortium, made up of firms CSC SA, Mutoni SA and Pizzarotti SA, decided to construct 18 concrete pillars for each of the viaduct’s five sectors. The pillars were only to be used to support the construction of the upper structure and would then have to be demolished once the building work had been finished. However, Pilosio said the decision to use its MP high-capacity towers – coupled in pairs by horizontal stiffeners allowing them to be moved en masse from sector to sector - meant that significant time could be saved instead of waiting for the concrete of the support pillars to be fully set. The Italian firm said this allowed better continuity between the striking of the formwork of one sector and the assembly of the support structure for the next sector.

The adjustment of the heights of the towers to the height of the viaduct is said by Pilosio to be achieved by adjusting the forks and the reinforced base plates. Pilosio said the use of its towers for the viaduct works allowed the best number of workers to be employed in the assembly and dismantling phases, enabling a major financial saving through reduced material use.

For more information on companies in this article

Related Content

  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Pilosio runs landmark peace awards event in Venice
    November 21, 2014
    Formwork firm Pilosio is taking corporate responsibility and sustainability very seriously indeed through its peace awards - Kristina Smith reports Italian formwork specialist Pilosio held its fourth annual Building Peace Award in the historic setting of Venice’s Scuola Grande on Friday 12th September. This year’s winner was politician Samia Yaba Nkrumah, the daughter of Ghana’s first democratically elected president, highlighting her planned project to build a new library and learning space in Akosombo, ne
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Kofi Annan helps formwork specialist Pilosio take CSR to the next level
    September 16, 2014
    Italian formwork specialist Pilosio held its fourth annual Building Peace Award in the historic setting of Venice’s Scuola Grande on Friday 12 September. This year’s winner was politician Samia Yaba Nkrumah, the daughter of Ghana’s first democratically elected president, highlighting her planned project to build a new library and learning space in Akosombo, near Lake Volta, dedicated to her father. Over 300 guests from around the world, including 150 Pilosio clients, attended the event and heard keynote sp