Skip to main content

Piling rig performs in difficult conditions

Specialist contractor Implenia Bau recently carried out some piling work for main contractor Keller Bauunternehmung on a project at Rorsach in Switzerland.
February 28, 2012 Read time: 1 min
A powerful Liebherr rotary piling rig was able to carry out a tricky construction project in Rorschach next to a key road link
Specialist contractor 2552 Implenia Bau recently carried out some piling work for main contractor 3317 Keller Bauunternehmung on a project at Rorsach in Switzerland.
 The work involved the construction of a secant pile wall as part of a project to build the Raiffeisenbank, located next to a key road. The company opted to use a 718 Liebherr LB28 piling rig equipped with a DBA200 rotary head. The specifications required the installation of 3,000 linear metres of piles to form a secant drilled pile wall within 10 weeks. The 225 piles measure from 12-16m with diameters of 700mm. The whole construction project lasted 4 months in total. The secant pile wall was built using a DBA200 double rotary head delivering a torque of up to 200kNm at the drill casing and 100kNm at the auger. The drill casing and auger were drilled out in one working cycle, with concreting carried out as the drilling equipment was removed and the reinforcement placed later.

For more information on companies in this article

Related Content

  • Peri delivers formwork for Fehmarnbelt Tunnel
    July 12, 2023
    The last of the 12 ships delivering Peri’s formwork recently arrived at the tunnel element factory east of Rødbyhavn on Denmark’s Lolland island.
  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • Innovative surface treatment for concrete road
    July 30, 2019
    An innovative surface treatment approach by Foster Contracting Limited has been developed for use on a £745million roads project in Aberdeen, Scotland. The specialist contractor, Foster Contracting Limited (FCL), has played a key role in a major project, to build the Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T). AWPR Construction Joint Venture, the contractor appointed to design and construct the project, approached FCL to provide a customised treatment to remove the latency from the sl
  • Engineering the Saadiyat Expressway
    February 24, 2012
    A new bridge, said to be the largest in the United Arab Emirates (UAE) in terms of area, is being constructed as part of a major highway project. The US$550 million Saadiyat Expressway project, which involves Leighton Construction (Abu Dhabi), related to one of Australia's largest contracting groups, in constructing a ten-lane, 6.5km long highway to link the UAE's main city, with an exclusive island lying just offshore.