Skip to main content

Piling job at interchange

Specialist geotechnical contractors, Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich, West Midlands, England, for a Balfour Beatty/Birse joint venture.
February 17, 2012 Read time: 2 mins
Peri's VST System is being used on a bridge spanning the Sordo Valley in Portugal
Specialist geotechnical contractors, Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich, West Midlands, England, for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about e3 million, and expected to last 15 weeks, the project consists of heavy duty CFA (continuous flight auger) and cased CFA secant piling. [A continuous flight augering drill is used to excavate a hole and concrete is injected through a hollow shaft under pressure as the auger is extracted. This creates a continuous pile without ever leaving an open hole].

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary (female) piles in the new overbridges wing walls.

1485 Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70.

Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible. Different rigs will be used for the various stages."

For more information on companies in this article

Related Content

  • Piling on the power
    July 20, 2012
    Liebherr's new LB Series rotary drilling rigs are designed for operations using Kelly equipment, continuous flight augers and double rotary heads. These can be used in an array of ground stabilisation applications for construction projects and complement the firm's proven LRB range of combined piling and drilling machines. There are four models in the new LB range, with operating weights from 68.4-113.5tonnes and these are capable of drilling diameters from 1.2-2.5m and to depths from 35-70m using Kelly equ
  • Smart constructioon with GIS, GPS design technology
    May 2, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Smart constructioon with GIS, GPS design technology
    February 16, 2012
    A UK highway project has benefited from the latest software, GIS and GPS technology, Mike Woof reports. Sophisticated software, GIS and GPS technology has played an important role in a large highway upgrade project in the UK and helping to increase efficiency and drive down construction costs.
  • Key expressway route through Hunter Valley
    November 11, 2013
    Australia’s Hunter Valley will benefit from a new high speed expressway, which is currently under construction - Simon Gould reports Located two hours north of Sydney, the Hunter Valley region in New South Wales is one of Australia’s largest producers of coal and wine. With international demand, particularly from Asia, for both continuing to increase, a significant upgrade of infrastructure was required between the region and the port of Newcastle, the world’s largest coal export port. However the strict en