Skip to main content

Piling job at interchange

Specialist geotechnical contractors, Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich, West Midlands, England, for a Balfour Beatty/Birse joint venture.
February 17, 2012 Read time: 2 mins
Peri's VST System is being used on a bridge spanning the Sordo Valley in Portugal
Specialist geotechnical contractors, Bachy Soletanche has started work on a new grade separated interchange on the A41 road in West Bromwich, West Midlands, England, for a 1146 Balfour Beatty/1486 Birse joint venture.

Worth about e3 million, and expected to last 15 weeks, the project consists of heavy duty CFA (continuous flight auger) and cased CFA secant piling. [A continuous flight augering drill is used to excavate a hole and concrete is injected through a hollow shaft under pressure as the auger is extracted. This creates a continuous pile without ever leaving an open hole].

The hard/hard and hard/firm secant CFA piles are 600, 750 and 900mm diameter and up to 18.5m deep, and were designed by Sandwell Metropolitan Borough Council's engineer, Scott Wilson, and include reinforced primary (female) piles in the new overbridges wing walls.

1485 Bachy Soletanche's biggest rig, a BG40, is being used for the cased CFA secant piles with the remainder being installed by a CM70.

Once complete, the retaining walls will form the new underpass beneath the newly-aligned roundabout so as to improve traffic flow on the A41.

Paul Hodgson, business development manager at Bachy Soletanche, said: "This is our biggest job in the Midlands at the moment and it's crucial we stick to schedule so as little disruption occurs as possible. Different rigs will be used for the various stages."

For more information on companies in this article

Related Content

  • Bauer’s BG 30, part of the rig manufacturer’s ValueLine platform
    January 6, 2017
    Bauer Maschinen is presenting a new generation of its ValueLine, a medium-sized platform range for bored piles with a diameter of up to 2.5m and a drilling depth of up to 70m. The platform range includes the BG 26 as the lowest priced-model and the larger version, the BG 30. The core element of the medium-sized platform range is the joint BT base carrier, which was entirely designed and constructed by Bauer. The modern and highly functional support does not just score points for its high safety standa
  • Balfour and Vinci slide bridge over the M42
    January 6, 2023
    Workers slid the concrete shell of a 12,600-tonne bridge a record 165m to position it across the M42 motorway in the northern English county of Warwickshire.
  • Liebherr’s revolutionary electric cranes
    April 6, 2021
    Liebherr has unveiled what it claims are the world’s first battery-powered crawler crane models.
  • VIDEO: Balfour starts M3 bridge upgrade in UK following demolition
    November 23, 2016
    Balfour Beatty has started bridge work over the M3 motorway as part of a €205 million upgrade on highway connecting London to south coast ports. Balfour recently demolished the Woodlands Lane Bridge between junctions 2 and 3 near Windlesham on the M3 which runs from the capital to Southampton and Portsmouth. A new bridge is being constructed Balfour Beatty is working for the agency Highways England to reduce congestion this section of the M3 that handles more than 130,000 vehicle journeys every day.