Skip to main content

Peri has Polish bridge covered

A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used. Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.
February 6, 2012 Read time: 3 mins
A new bridge is being constructed across the Vistula River near Grudzi?dz, Poland, and for the foreland bridge from south-east direction, a so-called incremental launching method is being used.

Two lanes, each some 556m long, are being constructed in 25 concreting cycles with standard lengths of 24m, while the formwork is 25m long and is positioned behind the bridge abutments.

The individual sections of the superstructure are concreted directly together here and connected by means of tensioning cables. Subsequently, the hardened bridge section is raised a few millimetres and moved forward together with the other finished segments by one cycle length in the direction of the bridge's longitudinal axis.

Prefabrication of the individual repetitive bridge sections is being carried out with a stationary formwork, and a temporary protection roof, based on the 298 PERI UP modular scaffold, spans the working area and allows weather-independent construction of the individual sections for the superstructure.

According to the German formwork manufacturer this is one of the factors that allowed the 2296 Skanska-1547 NDI Joint Venture to reduce the construction period by three months.

For concreting work on the hollow box profile, a construction time of a year was originally planned, and as work started in November 2009, minimum temperatures of up to -25°C were expected during the winter.

To cater for the weather, the contractor planned the temporary protection roof for the construction phase: the possibility of renting the LGS (lattice girder system) protection roof for the period of use provided an economical solution.

Altogether, the jobsite team is using four roof structures: two smaller, permanently installed tents are used for reinforcement work preparations, while two movable protection roofs on basis of the LGS span the formwork and concreting areas.

To ensure unhindered material and concrete installation, the design allows the protection roofs to be moved. The girder supports are equipped with 55.5m long rails, which are over twice as long as the protection roofs and which are easily moved by two to four people. The wheel allows the roofs to be moved in a longitudinal direction.

"At the level of the girder, the static system of a single-span beam with one stationary and one movable support can be realised without any problems by means of system components," says PERI.

The spatial arrangement of the two sets of incremental launching equipment gave the position for the weather protection roofs: the available space between the formwork for both lanes was very limited. Load transfer of the support construction of both weather protection roofs had to be guaranteed via a common central support.

"With Keder track and sheeting, the scaffold constructions result in very light and translucent roofs. The solution in Grudzi?dz also includes a side and gable covering. "Overlapping of the sheeting at all joints ensures a tightly-fitting enclosure which at the same time can easily be opened. With extremely low outside temperatures, the temporary tents were also heated.

"An additional positive effect of the enclosure is the consistently high concrete quality achieved throughout due to the constantly good setting process."

For more information on companies in this article

Related Content

  • Seal of approval
    August 2, 2012
    Timely maintenance using proven cost-effective methods can extend the life of a highway by many years as Patrick smith reports Highways are expensive assets to construct, and the wear and tear of modern traffic means that regular maintenance will delay costly repairs or in extreme cases reconstruction. There are a number of methods of carrying out such maintenance, and these include the use of slurry seals and micro-surfacing, which are cold mixed asphalt which is a mixture of graded aggregate, asphalt emul
  • Heavy haulage in Mexico
    August 15, 2018
    Mexican heavy haulage specialist Tradelossa, headquartered in Durango, is celebrating its 45th anniversary The company says that it offers solutions for the heavy haul and abnormal load transportation industry and handles national and international logistics operations in North and South America. For many years the company has been purchasing specialist heavy haulage equipment from the German firm, Goldhofer. The Tradelossa fleet includes various types of heavy-duty modules and an extensive selection o
  • The compact, modular system from IPC Global can carry out four tests accurately
    April 11, 2013
    IPC Global has launched thermal asphalt multi-test system TSRSTplus, a compact modular machine which allows engineers to accurately perform four tests that characterise the resistance of asphalt mixtures to low-temperature cracking. The results can assist in pavement design and structural analysis to reduce thermal cracking and improve the life cycle performance of asphalt pavements. It is the only commercially available low temperature uniaxial testing machine with three test stations. The ability to test
  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade