Skip to main content

Paschal has the angle

Formwork manufacturer Paschal says that it has further expanded the application range of its lightweight multi-waler by developing a hinge piece.
December 16, 2020 Read time: 1 min
Paschal’s multi-waler hinge fits onto an acute-angled formwork structure

The multi-waler is compatible with all Paschal formwork systems for stiffening a bracing of panels, for filler pieces and for stop ends as well as a wall stop bar.

The multi-waler for stiffening horizontal and vertical panel joints was itself shown at the bauma trade fair in Munich in 2019. The handy multi-waler hinged part was added shortly afterwards.

The addition of a hinge allows practical connecting of element for both acute- and obtuse-angled concrete structures. Angled structures ranging from an acute 60° to an obtuse 150° angle can be tied. Panel connections mounted around corners can be simply, easily and rapidly stiffened, according to the company, based in Steinach, southern Germany.

Two multi-walers can be joined with a force-fitted connection via the hinged part with bolts and a security pin - stiffening panels around corners couldn't be easier, says Paschal.

The 1.4m-long multi-waler can be connected to the formwork panels using a LOGO clamping piece or, alternatively, using hook headed bolts and a plate with ball-and-socket joint or a waler support DW 15.

For more information on companies in this article

Related Content

  • Final beam for Gerald Desmond replacement
    June 18, 2020
    The final steel beam has been installed for the replacement Port of Long Beach bridge - California’s first cable-stayed bridge for vehicles.
  • Formwork developments in bridge construction
    February 23, 2012
    Major infrastructure projects worldwide are relying on innovative formwork solutions for speed and safety as Patrick Smith reports. The 970m long cable-stayed Golden Ears Bridge crossing the Fraser River in Vancouver, Canada, is the core element of a six-lane, highway project near the Canadian west coast.
  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    February 19, 2016
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    January 6, 2017
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system