Skip to main content

Paschal has the angle

Formwork manufacturer Paschal says that it has further expanded the application range of its lightweight multi-waler by developing a hinge piece.
December 16, 2020 Read time: 1 min
Paschal’s multi-waler hinge fits onto an acute-angled formwork structure

The multi-waler is compatible with all Paschal formwork systems for stiffening a bracing of panels, for filler pieces and for stop ends as well as a wall stop bar.

The multi-waler for stiffening horizontal and vertical panel joints was itself shown at the bauma trade fair in Munich in 2019. The handy multi-waler hinged part was added shortly afterwards.

The addition of a hinge allows practical connecting of element for both acute- and obtuse-angled concrete structures. Angled structures ranging from an acute 60° to an obtuse 150° angle can be tied. Panel connections mounted around corners can be simply, easily and rapidly stiffened, according to the company, based in Steinach, southern Germany.

Two multi-walers can be joined with a force-fitted connection via the hinged part with bolts and a security pin - stiffening panels around corners couldn't be easier, says Paschal.

The 1.4m-long multi-waler can be connected to the formwork panels using a LOGO clamping piece or, alternatively, using hook headed bolts and a plate with ball-and-socket joint or a waler support DW 15.

For more information on companies in this article

Related Content

  • Opening day on Monday for bauma
    October 20, 2022
    The event, at the Trade Fair Center Messe München in Munich, will see thousands of attendees at the week-long exhibition.
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well
  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Hammerglass barriers for Förbifart Stockholm
    August 20, 2021
    Swedish firm Hammerglass is supplying its transparent PostFree sound barriers for the bypass.