Skip to main content

Paschal gets concrete results with Maturix

Formwork specialist Paschal is now offering real-time concrete curing measurement using Maturix, a new system developed in Denmark. Am ordinary inexpensive wire is permanently embedded into the concrete during pouring. Concrete strength analysis and monitoring is carried out by wireless radio transmitters – this allows both improved planning and real-time monitoring independent of location and time, according to both companies. The optimal time for dismantling formwork is determined. The user rec
June 11, 2019 Read time: 2 mins
Maturix concrete curing measurement system
Formwork specialist Paschal is now offering real-time concrete curing measurement using Maturix, a new system developed in Denmark.


Am ordinary inexpensive wire is permanently embedded into the concrete during pouring.

Concrete strength analysis and monitoring is carried out by wireless radio transmitters – this allows both improved planning and real-time monitoring independent of location and time, according to both companies.

The optimal time for dismantling formwork is determined. The user receives a convenient notification as soon as the target value has been reached or if there is too much difference in the internal temperature.

To guarantee the best possible concrete quality, the concrete temperature can be controlled and adjusted from any location by means of heating and cooling systems.

The Maturix software is a web-based application that can be accessed from anywhere.

When the concrete is cured and the formwork is to be moved, the wire is simply cut off close to the concrete face. A new wire is effortlessly installed into the measuring unit, ready to be embedded into a new pour as needed.

Applications for Maturix are many, says Rasmus Uhre, Maturix product manager. They include buildings, dams, bridges and even concrete roads.

Related Content

  • Innovative concrete paving technology is coming to market
    March 12, 2014
    Two of the leaders in the concrete paving sector are broadening their range of technology, with new systems now coming to the international market The concrete paving market is a niche segment of the construction equipment business, with only a few specialist firms competing. North America is the home of concrete slipforming technology and it is no surprise that all but one of the leading firms in the sector are based in the US. The technology is used worldwide however and with asphalt prices at a high, c
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci
  • GPS technology developments
    June 13, 2012
    The use of GPS-inclusive technology is proving invaluable to contractors responsible for major transport-related construction projects across the globe. Guy Woodford looked at some of the latest and imminent site solutions featuring GPS Staff at Trimble Heavy Construction based in Sunnyvale, California recently finished developing three new solutions for connecting the construction site. The Trimble Connected Office, the Trimble Connected Controller and the Trimble Connected Machine, are all now available t
  • The Mersey Gateway bridge project continues on schedule
    October 18, 2016
    Work continues on the 2.3km Mersey Gateway signature bridge project close to Liverpool in the UK. David Arminas reports on some of the construction highlights. Under construction is a cable-stayed structure with three towers that will span the Mersey River’s expansive mud flats between the towns of Runcorn and Widnes near Liverpool. Including the approach viaducts on each side, it will be 2.3km long with a river span of 1km. The main bridge deck will be reinforced concrete. The 80m-high central tower will b