Skip to main content

Norway’s Beitstad Bridge opens

Norway has officially opened the Beitstad Bridge over the Beitstad Sund, between the towns of Steinkjer and Verran in Nord-Trøndelag County.
June 22, 2020 Read time: 2 mins
Sarens barged the bridge segments from Malm to the construction site (photo courtesy Sarens)

The 580m-long steel-concrete composite bridge, constructed by China’s Sichuan Road and Bridge Group (SRBG), is part of Norway’s County Roads 17 and 720. The company won the contract through an open tender and finished the project in 26 months.

Last September, heavy lifting specialist Sarens finished installing six pre-assembled bridge segments, varying between 40-150m long and up to 15m wide. The segments weighed between 130-780tonnes. Sarens barged the bridge segments from Malm to the construction site, a distance of about 5km. The crew also used a 24-axle SPMT (self-propelled modular transporter from Mammoet), a Kobelco hydraulic CKE-2500 crawler crane and a Terex-Demag CC8800-1 crawler crane. The CC8800-1 had a capacity of 1,600tonnes and was fitted onto the barge to perform all heavy lifts.

Sarens said that this was the first time a CC8800-1 crane had been used to install bridge elements from a Sarens barge. It was loaded onto a barge in Gent, Belgium, and towed to Malm in Norway by tugboat - an eight-day voyage. The crane was then configured in SSL MB 84m configuration for the first four lifts and the main boom was lengthened to 120m for the last two elements.

The crew lifted the first segment on day one and the sixth and final segment on day 14 – a two-week time frame set by the client, according to Joost Elsen, Sarens operations head who oversaw the work. “Challenges for the lifting were for once not the movement of the crane, but the exact positioning of the barge as we intended to minimise crane movements to only boom up and down to the installation radius.”

Main contractor SRBG says that its expertise lies in construction of deepwater long-span bridges, highway pavements and extra-long tunnels. Much of the company’s management team for the Beitstad Bridge came from the recently completed Halogaland Suspension Bridge, 200km north of the Arctic Circle. The Halogaland Bridge crosses the Rombaksfjorden in Narvik Municipality in Nordland County. Construction began in February 2013 and finished in December 2018 when it opened to traffic.

For more information on companies in this article

Related Content

  • THG Verk starts Ölfusá Bridge work
    December 9, 2024
    THG Verk - in Icelandic, ÞG Verk – is the main contractor for the 330m-long cable-stayed bridge that will cross the Ölfusá River, Iceland’s biggest.
  • Crane coverage for Turkish firm
    March 24, 2017
    Turkish crane rental Coskun Vinç is expanding coverage of the market with new additions to its fleet. These new all-terrain cranes are being delivered in 2017 and are a Demag AC 500-8 and an AC 220-5. Coskun Vinç owners Servet and Sedat Coskun selected the two Demag models after consulting with newly appointed Terex Cranes president Steve Filipov and Kerim Basakinci, owner of DAS, Terex Crane’s Turkish distributor. “We were pleased when Terex brought back the Demag brand earlier this year,” said Sedat Co
  • IRF Global Road Achievement Award Laureate
    January 5, 2016
    As a key engineering project on the Changsha-Chongqing Expressway in Southwest China, the Aizhai Bridge, constructed by the Hunan Road & Bridge Construction Group, was opened to traffic in March 2012. The Aizhai Bridge crosses the 1000m-wide scenic Dehang Canyon at an elevation of 355m. It has a main span of 1,176m, making it the world’s longest canyon-crossing bridge in the world. The erection of the main girder (the stiffening girder) of the Aizhai Bridge encountered serious challenges, including a la
  • German viaduct deal for STRABAG
    July 26, 2024
    STRABAG will handle a German road viaduct project in Hessen.