Skip to main content

Norway’s Beitstad Bridge opens

Norway has officially opened the Beitstad Bridge over the Beitstad Sund, between the towns of Steinkjer and Verran in Nord-Trøndelag County.
June 22, 2020 Read time: 2 mins
Sarens barged the bridge segments from Malm to the construction site (photo courtesy Sarens)

The 580m-long steel-concrete composite bridge, constructed by China’s Sichuan Road and Bridge Group (SRBG), is part of Norway’s County Roads 17 and 720. The company won the contract through an open tender and finished the project in 26 months.

Last September, heavy lifting specialist Sarens finished installing six pre-assembled bridge segments, varying between 40-150m long and up to 15m wide. The segments weighed between 130-780tonnes. Sarens barged the bridge segments from Malm to the construction site, a distance of about 5km. The crew also used a 24-axle SPMT (self-propelled modular transporter from Mammoet), a Kobelco hydraulic CKE-2500 crawler crane and a Terex-Demag CC8800-1 crawler crane. The CC8800-1 had a capacity of 1,600tonnes and was fitted onto the barge to perform all heavy lifts.

Sarens said that this was the first time a CC8800-1 crane had been used to install bridge elements from a Sarens barge. It was loaded onto a barge in Gent, Belgium, and towed to Malm in Norway by tugboat - an eight-day voyage. The crane was then configured in SSL MB 84m configuration for the first four lifts and the main boom was lengthened to 120m for the last two elements.

The crew lifted the first segment on day one and the sixth and final segment on day 14 – a two-week time frame set by the client, according to Joost Elsen, Sarens operations head who oversaw the work. “Challenges for the lifting were for once not the movement of the crane, but the exact positioning of the barge as we intended to minimise crane movements to only boom up and down to the installation radius.”

Main contractor SRBG says that its expertise lies in construction of deepwater long-span bridges, highway pavements and extra-long tunnels. Much of the company’s management team for the Beitstad Bridge came from the recently completed Halogaland Suspension Bridge, 200km north of the Arctic Circle. The Halogaland Bridge crosses the Rombaksfjorden in Narvik Municipality in Nordland County. Construction began in February 2013 and finished in December 2018 when it opened to traffic.

For more information on companies in this article

Related Content

  • Kobelco rolls out seven mini-excavators at INTERMAT 2015
    January 6, 2017
    Kobelco has unveiled seven new mini-excavators below 3tonnes at INTERMAT 2015 in Paris as a result of a major agreement with construction equipment manufacturer Yanmar. The deal increases the options for Kobelco customers and potential customers who work in extremely tight environments. “INTERMAT is our first announcement and roll out of these models,” said Sander Gesink, Kobelco’s brand marketing manager.
  • Kobelco rolls out seven mini-excavators at INTERMAT 2015
    April 24, 2015
    Kobelco has unveiled seven new mini-excavators below 3tonnes at INTERMAT 2015 in Paris as a result of a major agreement with construction equipment manufacturer Yanmar. The deal increases the options for Kobelco customers and potential customers who work in extremely tight environments. “INTERMAT is our first announcement and roll out of these models,” said Sander Gesink, Kobelco’s brand marketing manager.
  • Long reach equipment simplifies demolition
    February 14, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life.
  • Long reach equipment simplifies demolition
    April 13, 2012
    Demolition is a highly specialised business, as the machinery required to carry out the work on high-rise demolition contracts can be very site specific. Today's high reach demolition rig is no longer simply a tracked excavator with a long boom, indeed some machines cannot be used as excavators at all. Likewise a machine that is dedicated to carrying a 2.5 or 3tonne shear or hammer will need to be built to take the stresses and strains of demolition life. Many of the ultra long boom machines are designed