Skip to main content

New hydrodemolition system from Aquajet

Aquajet Systems says that its new Aqua Spine is a modular system that uses high-pressure water jets to remove concrete from surfaces that may be inaccessible for Aqua Cutter robots. The Aqua Spine allows hydrodemolition techniques to be used in areas that would otherwise be difficult to access, providing a safe and efficient technology for users. Hydrodemolition uses high-pressure water jets to precisely remove sound, deteriorated or damaged concrete. The sustainable method leaves rebar undamaged while pro
August 10, 2018 Read time: 2 mins
Aquajet now offers improved technology for hydrodemolition in compact spaces
2784 Aquajet Systems says that its new Aqua Spine is a modular system that uses high-pressure water jets to remove concrete from surfaces that may be inaccessible for Aqua Cutter robots. The Aqua Spine allows hydrodemolition techniques to be used in areas that would otherwise be difficult to access, providing a safe and efficient technology for users.


Hydrodemolition uses high-pressure water jets to precisely remove sound, deteriorated or damaged concrete. The sustainable method leaves rebar undamaged while protecting and preserving existing concrete. The Aqua Spine eliminates vibrations that cause microfracturing as well as reduces exposure to harmful silica dust. The method leaves a sound surface ready to accept new material.

Aquajet designed the Aqua Spine as a multimodular system with a single feed beam to ensure adaptability to different applications. The system adjusts from 1-6m and works well in applications such as roads and bridges and underwater demolition. The modular design allows the Aqua Spine to enter hard-to-reach corners to remove concrete without the use of hand lances.

An Aqua Cutter robot or standard Power Control Unit controls the Aqua Spine, while a separate power pack houses a powerful diesel and high-pressure pump as well as tools and attachments. When working on flat surfaces, the modular system bolts onto walls, floors or ceilings. For increased versatility, hydraulic platforms, cranes and scaffolding can support the Aqua Spine. The system can be used underwater on bridge pillars using the circular power head. The Aqua Spine also comes with the adjustable oscillation system, which allows the stroke of water to be changed within a minute to adapt the nozzles for varying depths of cuts.

For more information on companies in this article

Related Content

  • Utility machine innovations coming to market
    December 1, 2022
    A wide array of new items of compact utility equipment are coming to market, with low emissions and noise as key machine trends
  • Chicago Pneumatic’s new concrete stars
    May 14, 2014
    Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting. Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic p
  • Chicago Pneumatic’s new concrete stars
    May 14, 2014
    Chicago Pneumatic (CP) has unveiled its comprehensive new concrete equipment range. In applications from walls to floor slabs, the range has products to cover every step of the job, from vibration and levelling to finishing and cutting. Freshly poured concrete has air voids which must be removed by vibration to increase its density and finished strength. Depending on the concrete’s depth and slump, this can be achieved using a poker or screed. Customers can now choose mechanical, electric or pneumatic p
  • Formwork innovations help bridge building
    July 7, 2015
    A series of formwork developments are helping with challenging bridge construction projects around the world - Mike Woof writes In the Polish city of Krakow, a cost-effective cable stayed bridge is being constructed using a balanced cantilever technique. The current expansion of the Krakow metropolitan railway network (KST) requires the building of a crossing of the Krakow-Plaszow railway junction. Ensuring that daily rail operations remained unaffected during the construction of the 252m long crossing w