Skip to main content

New bridge surfacing

A new wearing course applied by Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried o
February 6, 2012 Read time: 2 mins
Using Bolidt's technology to resurface a Rotterdam bridge cut installation time
A new wearing course applied by 2291 Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried out using a machine developed by Bolidt, speeding installation.

Although the previous wearing course was still intact, the decision to replace it was made as part of a maintenance operation. Over one weekend, the entire eastern section of the bridge was resurfaced with a new wearing course and lining. The work was carried out in less than 36 hours due to the equipment used and this high productivity was of key importance as Rotterdam has a heavy traffic load and a prolonged closure would have resulted in serious congestion.

The Bolimix machine was developed by Bolidt originally for the application of wearing courses on concrete bases. The Erasmus Bridge has a steel base, which requires a different type of wearing course and Bolidt had to adapt the machine especially for the work. Exchangeable tanks, allowing a short conversion time, were made to achieve this. Where in the past it was necessary to have several days of dry weather, this has now been reduced to approximately 1.5 days. After the wearing course has been applied, rain no longer forms a hindrance.

For more information on companies in this article

Related Content

  • New marking technologies being developed
    June 30, 2014
    Innovative roadmarking technologies will increase productivity, improve conspicuity in poor conditions and offer increased wear life - Mike Woof writes. Major advances have been seen in roadmarking systems now being offered on the market. More sophisticated machinery will increase productivity and quality when installing markings, while new systems will also last longer in use. In addition, smart technologies can detect wear and provide highway authorities with an accurate picture of network safety, at comp
  • New bridge refurbishment solutions now available
    July 15, 2015
    An array of new bridge refurbishment and repair solutions are available – Mike Woof writes Around the world there are many bridges requiring repairs or refurbishment, and there is a ready market for novel solutions to upgrade existing structures. New developments offer quicker and more efficient ways to improve bridge surfaces and structural performance and add new life to ageing designs. Spancrete is broadening the availability of its novel precast building solutions worldwide by offering these to th
  • Super job for a Demag CC 3800-1 without a Superlift counterweight
    July 4, 2019
    A Demag CC 3800-1 crane with an 84m-long main boom was recently set up in Germany without a Superlift counterweight to save space. The jobsite was the replacement of the old viaduct on the A45 Freeway that spans the Lahn River near Dorlar in Germany. Bietigheim-Bissingen-based crane service provider Wiesbauer solved the site’s space issues by using a Demag CC 3800-1. “This site required us to lift loads of 96-148tonnes at radii of 40-64m, so there was no option but to use a crawler crane in the 650tonne c
  • Nigeria’s Eko Atlantic project: a city on the sea
    September 27, 2013
    Imagine a megapolis rising, Atlantis-like, from the sea. An urban development similar in size to New York’s Manhattan that boasts thriving business and residential districts to help transform not just a city but an entire country. It sounds like the stuff of science fiction. But the Eko Atlantic project in Lagos, Nigeria, is real and has become one of the most dazzling and most discussed construction developments in the entire world. One hundred years ago, the area of land on which the new city will be bu