Skip to main content

New bridge surfacing

A new wearing course applied by Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried o
February 6, 2012 Read time: 2 mins
Using Bolidt's technology to resurface a Rotterdam bridge cut installation time
A new wearing course applied by 2291 Bolidt on the entire eastern section of the Erasmus Bridge in Rotterdam is helping improve the surface for road users. The bridge forms an important link in the centre of the city of Rotterdam and using its equipment Bolidt was able to apply 3,000m2 of new wearing course on Erasmus Bridge in 4 hours. The Rotterdam authorities commissioned Bolidt again after the previous surface the firm applied, its Bridgedeck Up product, lasted over a decade. This time the work was carried out using a machine developed by Bolidt, speeding installation.

Although the previous wearing course was still intact, the decision to replace it was made as part of a maintenance operation. Over one weekend, the entire eastern section of the bridge was resurfaced with a new wearing course and lining. The work was carried out in less than 36 hours due to the equipment used and this high productivity was of key importance as Rotterdam has a heavy traffic load and a prolonged closure would have resulted in serious congestion.

The Bolimix machine was developed by Bolidt originally for the application of wearing courses on concrete bases. The Erasmus Bridge has a steel base, which requires a different type of wearing course and Bolidt had to adapt the machine especially for the work. Exchangeable tanks, allowing a short conversion time, were made to achieve this. Where in the past it was necessary to have several days of dry weather, this has now been reduced to approximately 1.5 days. After the wearing course has been applied, rain no longer forms a hindrance.

For more information on companies in this article

Related Content

  • New chapter for bituminous slurry in Colombia
    January 11, 2019
    Colombia’s San Rafael road concessionaire is using its first VSB Macropaver 12B unit to maintain a road carrying heavy traffic volumes – Enrique Saez writes The use of bituminous slurry for road maintenance works in Colombia is taking a new step forward with the purchase of equipment from VSS Macropaver by road contractors in the country. Engineer Ezequiel Romero, manager of the concessionaire San Rafael, explained that the application of bituminous grout has delivered major benefits for the firm. The c
  • How Hitex changed its products to meet the demands of India’s roads
    December 7, 2016
    The Indian Government is keen to embrace new technologies and ideas from overseas but as Hitex International discovered, Indian roads need very special products - Kristina Smith reports
  • Cat paves the way in Portugal
    June 22, 2012
    Caterpillar pavers were used recently to help improve drainage on a vital road into a popular tourist destination in Portugal. The Avenida Marginal is the main road access into Cascais, a village with historic hotels, winding roads and stunning views of the Atlantic Ocean attracting thousands of holidaymakers each year. However, the highway had been suffering from poor draining resulting in rivulets being formed in heavy rain, making travelling hazardous for cars and pedestrians alike.
  • Indian quarry boosts wear life and output
    June 20, 2016
    An Indian quarry facility has seen increased uptime and gains in overall efficiency due to the installation of new wear components in its crushing system Installing new distributor plates in this Indian granite quarry has increased its plate operational lifetime by 400-500%. Panchami Stone has fitted the unique HX900 plates to the 85 HP rotor of its Sandvik Construction CV218 VSI, reducing its replacement costs by 50%. The Panchami Stone granite quarry is located 60km from Bangalore, in the south of I