Skip to main content

Morgan’s FireMaster FireBarrier 135 boosts tunnel protection

Morgan Advanced Materials says its new FireMaster FireBarrier 135 sprayed refractory cement offers superior fire protection and simple, cost-effective installation. The 135 is ideal for concrete tunnel lining and ventilation shafts, escape tunnels and refuges as well as critical systems such as water mains and communication cables.
January 6, 2015 Read time: 2 mins
FireBarrier 135: no spalling when hose-sprayed

7961 Morgan Advanced Materials says its new FireMaster FireBarrier 135 sprayed refractory cement offers superior fire protection and simple, cost-effective installation.

The 135 is ideal for concrete tunnel lining and ventilation shafts, escape tunnels and refuges as well as critical systems such as water mains and communication cables. Unlike most other products, it can withstand repeated and prolonged exposure to the high-temperatures found in tunnel fires. It can be installed onto concrete or metal substrates using standard spray equipment and features very low spraying wastage during installation.

Single-layer application makes it fast and easy to install. It is adhesive to most construction materials and can be installed quickly, helping to reduce labour costs while maintaining the final product’s quality and proven reliability. Adhesion strength is typically eight times its weight. It can be trowelled flat to provide a high-quality surface finish that can be the final tunnel lining surface, with optional painting. This avoids the need for expensive secondary cladding. The material can also be cast into sheet-form and installed as a dry board or shaped for applications where spraying is not convenient.

Comprehensive and extensive testing of FireMaster FireBarrier 135 per the RWS fire curve, and required by NFPA 502, has proven that the material resists harsh environmental conditions found in tunnels. It is also resistant to water jet-spray used to clean tunnel lining and will not spall when subjected to water hose-spray at high temperature.

For more information on companies in this article

Related Content

  • Peri formwork for Danish port link tunnel project
    November 29, 2013
    The Nordhavnsvej – Vej- og Tunnelentreprise (Nordhavnsvej) project is Copenhagen’s largest infrastructure project in the last 50 years. The 1.65km-long route will eventually link the Danish capital’s northern port area with the Helsingør motorway. It runs through a very densely built urban area, in parts at depths of up to 22m. One particular challenge regarding the execution was planning the course of the tunnel because the underground structure also crosses a very busy railway line.
  • Superior gets into the Spirit at Hillhead
    November 6, 2018
    US-based Superior Industries says its new modular Spirit Sand Plant – shown at this year’s Hillhead exhibition in the UK - boosts performance while lowering wear The Spirit merges the manufacturer’s Helix Cyclone, Dewatering Screen, sump tank and slurry pump into a single plant capable of sand production, fines recovery and dewatering. It has a more geometrically efficient inlet to boost performance and lower wear to internal components. In addition, all wetted surfaces are lined with cast polyurethane f
  • Sophisticated concrete plants coming to market
    July 28, 2015
    Concrete production technology is advancing as new systems come to market – Mike Woof reports The efficient production of high-quality concrete is crucial to many construction projects. Whether high-output plants are being used for large bridge or tunnel projects, or smaller mobile units are being used to supply specific operations such as central reservation barrier installation, the quality of the product is vital. Production technology has improved across the board due to the introduction of new systems.
  • Extraction operation benefits from haul road improvement
    May 23, 2014
    The trial of a novel compound at a site in Chile has shown how structural improvements can be achieved for dirt road applications Although the Barrick Gold Pascua Lama operation is a surface mining site, the experience with this technology is equally applicable for use on haul roads in large quarries or for dirt roads expected to carry heavy loads. This is of particular importance for transport in remote areas where large loads such as pre-cast bridge sections or girders for example may have to be carrie