Modular water treatment solutions

Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
May 3, 2021 Read time: 2 mins
A modular system from Siltbuster is being used to protect water courses around the Preston Western Distributor Road project

The 4km dual carriageway is set to open in 2023 and includes a new motorway junction, four new bridges and three underpasses. The route goes past several surface watercourses, including the Savick Brook and the Lancaster Canal. With this in mind, Costain contacted Siltbuster and tasked it with planning the water runoff management.

Siltbuster has deployed four water treatment systems to cover the multiple controlled watercourses where water is being released from the site. Each location is regulated by the Environment Agency, with the Environmental Permit requiring total suspended solids to be less than 100mg/litre and a pH value between pH6 and pH9 to be achieved consistently.

In order to protect the north-west's aquatic ecosystems and habitats, each Siltbuster unit needed to be capable of treating flows of up to 40m3/hr. To deliver this, all of the systems include two-stage flow proportional chemical dosing of coagulant and flocculant to improve the settlement rates of the very fine suspended clay solids, and an 8m3 tank complete with mixers and a HB50 lamella clarifier. The modular nature of these solutions means additional capacity can easily be added should there be greater volumes of water needing to be treated.

Costain said that Siltbuster systems have helped keep the project on track by ensuring the contractor is in line with its environmental permit at all times, protecting the surrounding habitats. Because Siltbuster was consulted from an early stage in the project, the firm was able to advise on temporary flexible modular solutions that could be rapidly deployed from its hire fleet as soon as the need arose. The company has also offered Costain specialist technical advice and training, helping to protect the aquatic ecosystems around the project.

For more information on companies in this article

Related Content

  • Slim design, efficient removal: New generation of large cold planers from BOMAG
    September 1, 2021
    Bomag launches its new BM/65 series of cold planers in early September 2021. With a CECE operating weight of only 27 tonnes, the BM 2000/65 is the lightest planer currently available in the 2-metre class. Its low weight achieved by the special lightweight design and the shorter conveyor belt now make the planers even more flexible to use. When it comes to efficiency, ease of operation and work safety, the new generation of planers features numerous innovative details
  • Hydro’s First Defense for Economical Surface Water Treatment
    February 20, 2014
    Hydro International’s innovative First Defense vortex separator is now available for the first time in the UK, in response to the growing need for economical surface water treatment on highways, car parks and new developments. Already well-established and proven in the U.S., First Defense uses a gentle vortex action to remove coarse particles, litter and oil from surface water runoff – a requirement which will become increasingly important due to growing regulation for Sustainable Drainage Systems (SuDS).
  • Terex Washing System’s bespoke plant for Paterson’s Quarries
    August 23, 2013
    A Terex Washing Systems (TWS) 150tonnes/hour recycling wash plant has recently been installed for Paterson’s Quarries in the UK. The bespoke plant is now up and running ten hours plus each day at the firm’s Greenoakhill Quarry & Recycling Centre in Glasgow. It is processing construction, demolition and excavation waste to produce four grades of stone and two grades of sand.
  • Uretek delivers voided soils treatment for UK’s M3 Smart Motorway
    February 8, 2018
    Ground engineering specialist Uretek has been treating voided soils as part of maintenance following completion of the UK’s M3 Smart Motorway project. Work is between junctions 2 and 4a where Uretek has provided a non-disruptive alternative to conventional underpinning to solve foundation subsidence problems. The focus for Uretek is an old 900mm corrugated pipe, 73m long. The old pipe has had a new 700mm pipe inserted inside. However, the old pipe is rusting and rapidly deteriorating.