Skip to main content

Modular water treatment solutions

Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
May 3, 2021 Read time: 2 mins
A modular system from Siltbuster is being used to protect water courses around the Preston Western Distributor Road project

The 4km dual carriageway is set to open in 2023 and includes a new motorway junction, four new bridges and three underpasses. The route goes past several surface watercourses, including the Savick Brook and the Lancaster Canal. With this in mind, Costain contacted Siltbuster and tasked it with planning the water runoff management.

Siltbuster has deployed four water treatment systems to cover the multiple controlled watercourses where water is being released from the site. Each location is regulated by the Environment Agency, with the Environmental Permit requiring total suspended solids to be less than 100mg/litre and a pH value between pH6 and pH9 to be achieved consistently.

In order to protect the north-west's aquatic ecosystems and habitats, each Siltbuster unit needed to be capable of treating flows of up to 40m3/hr. To deliver this, all of the systems include two-stage flow proportional chemical dosing of coagulant and flocculant to improve the settlement rates of the very fine suspended clay solids, and an 8m3 tank complete with mixers and a HB50 lamella clarifier. The modular nature of these solutions means additional capacity can easily be added should there be greater volumes of water needing to be treated.

Costain said that Siltbuster systems have helped keep the project on track by ensuring the contractor is in line with its environmental permit at all times, protecting the surrounding habitats. Because Siltbuster was consulted from an early stage in the project, the firm was able to advise on temporary flexible modular solutions that could be rapidly deployed from its hire fleet as soon as the need arose. The company has also offered Costain specialist technical advice and training, helping to protect the aquatic ecosystems around the project.

For more information on companies in this article

Related Content

  • Environmental solutions for tomorrow's roads
    August 2, 2012
    Leading the change, IRF organises its 2nd Conference on Roads & Environment in Geneva, Switzerland on 10-11 November 2008 An opinion poll in the UK at the end of June showed that more people think their government should first try to tackle environmental issues before trying to tackle global economic problems. Two-thirds of people were even in favour of green taxes, either now or when economic conditions improve. The environment remains high on the agenda in most countries, including in those where public o
  • Lowering the carbon footprint of asphalt production
    September 28, 2023
    Advances in asphalt production will reduce carbon emissions and energy consumption.
  • Ground penetrating radar used to investigate tunnel deterioration
    May 13, 2015
    Using ground penetrating radar to determine reason for serious pavement settling in Kentucky-Tennessee tunnel Just a few years after the opening of the Cumberland Gap Tunnel, highway officials noticed moderate to severe settling of the continuously reinforced concrete pavement. The mountain tunnel provides an important link between Kentucky and Tennessee along US25E and the problem looked serious, with many voids discovered beneath the pavement surface. To investigate the problems, the Kentucky Transpor
  • Beatty awarded H Agency Hull A63 Improvement Scheme
    August 8, 2014
    Balfour Beatty’s UK construction business has been awarded the €94.45 million (£75 million) A63 Castle Street improvement scheme in Hull for the Highways Agency under an Early Contractor Involvement (ECI) design and build contract. The 1.5km scheme in the centre of the city in East Yorkshire, northern England will improve journey times for road users through conversion of a major interchange into a split level junction with a two-lane dual carriageway carrying east-west traffic below north-south traffic in