Skip to main content

Modular water treatment solutions

Siltbuster has provided Costain with four modular treatment solutions, to be used during the delivery of the £200 million Preston Western Distributor Road, linking Preston and southern Fylde to the M55 motorway.
May 3, 2021 Read time: 2 mins
A modular system from Siltbuster is being used to protect water courses around the Preston Western Distributor Road project

The 4km dual carriageway is set to open in 2023 and includes a new motorway junction, four new bridges and three underpasses. The route goes past several surface watercourses, including the Savick Brook and the Lancaster Canal. With this in mind, Costain contacted Siltbuster and tasked it with planning the water runoff management.

Siltbuster has deployed four water treatment systems to cover the multiple controlled watercourses where water is being released from the site. Each location is regulated by the Environment Agency, with the Environmental Permit requiring total suspended solids to be less than 100mg/litre and a pH value between pH6 and pH9 to be achieved consistently.

In order to protect the north-west's aquatic ecosystems and habitats, each Siltbuster unit needed to be capable of treating flows of up to 40m3/hr. To deliver this, all of the systems include two-stage flow proportional chemical dosing of coagulant and flocculant to improve the settlement rates of the very fine suspended clay solids, and an 8m3 tank complete with mixers and a HB50 lamella clarifier. The modular nature of these solutions means additional capacity can easily be added should there be greater volumes of water needing to be treated.

Costain said that Siltbuster systems have helped keep the project on track by ensuring the contractor is in line with its environmental permit at all times, protecting the surrounding habitats. Because Siltbuster was consulted from an early stage in the project, the firm was able to advise on temporary flexible modular solutions that could be rapidly deployed from its hire fleet as soon as the need arose. The company has also offered Costain specialist technical advice and training, helping to protect the aquatic ecosystems around the project.

For more information on companies in this article

Related Content

  • Xylem’s enhanced Flygt 2600 drainage pump series is being unveiled.
    January 6, 2017
    The pumps, for use in tough dewatering conditions and applications, will be joined by a new submersible dewatering pump range comprising four new pumps ranging from 4-18kW, said to be ideal for water removal in the toughest applications in mining, tunnelling and other extremely harsh dewatering conditions. The Flygt 2600 drainage pumps feature Xylem’s patented DuraSpin hydraulic system; Hard-Iron impeller and plug-in cartridge seal. New enhancements to Xylem’s Flygt 2600 range include increased durability o
  • Xylem’s enhanced Flygt 2600 drainage pump series is being unveiled.
    February 12, 2013
    The pumps, for use in tough dewatering conditions and applications, will be joined by a new submersible dewatering pump range comprising four new pumps ranging from 4-18kW, said to be ideal for water removal in the toughest applications in mining, tunnelling and other extremely harsh dewatering conditions. The Flygt 2600 drainage pumps feature Xylem’s patented DuraSpin hydraulic system; Hard-Iron impeller and plug-in cartridge seal. New enhancements to Xylem’s Flygt 2600 range include increased durability o
  • Safety barriers offer positive workzone protection
    February 10, 2012
    A road project in Utah has benefited from the use of effective barrier protection during construction. *Paul Grant reports An upgraded section of road from 3500 South in West Valley City, Utah, is now open to traffic. The link was completely rebuilt by Utah DoT (UDOT) from the Bangerter Highway to 2700 West, and the road carries traffic from West Valley toward downtown Salt Lake City and the University of Utah. The work added two centre lanes, which are now the first dedicated Bus Rapid Transit lanes in Uta
  • Asphalt compaction finishing
    February 16, 2021
    Volvo CE is now offering a new rubber tyred compactor for finishing work in key emergent markets