Skip to main content

MAT Mischanlagentechnik debuts BE-2550 technology in Switzerland

The Bauer subsidiary MAT Mischanlagentechnik, known for microtunneling technology, has entered the large-diameter tunnelling market with its BE-2550 separating plant in Switzerland. The double-track Eppenberg tunnel in the Swiss canton of Solothurn is about 2.6 km long and is one of the busiest railway routes in Switzerland. Since November 2016, a 2,400tonne tunnel boring machine measuring around 115m long and 12.75m in diameter has been drilling through the mountain. The machine has been operating in the
April 12, 2018 Read time: 2 mins
For the Swiss Eppenberg Tunnel project, the entire six-unit BE-2550 separating plant was enclosed to cut noise and protect it against ice and snow
The 8350 Bauer subsidiary MAT Mischanlagentechnik, known for microtunneling technology, has entered the large-diameter tunnelling market with its BE-2550 separating plant in Switzerland.


The double-track Eppenberg tunnel in the Swiss canton of Solothurn is about 2.6 km long and is one of the busiest railway routes in Switzerland. Since November 2016, a 2,400tonne tunnel boring machine measuring around 115m long and 12.75m in diameter has been drilling through the mountain. The machine has been operating in the open mode hard rock until now; for the remaining 700m, the fluid-supported slurry technology will be used.

Since August 7, MAT Mischanlagentechnik has been using the BE-2550 – 22m long and 26m wide - for this last but crucial section of the tunnel which is due for a breakthrough this winter. The BE-2550 is made up of six adjoining and identical standalone plants of type BE-425-60 that can move around 2,400m³ of slurry hourly in a closed circuit system. The entire plant was enclosed to cut noise pollution and protect it against ice and snow. The bentonite slurry transports the excavated material continuously to the separating plant via a 3km pipeline. In the separation plant, the bentonite slurry is separated from the soil in multiple processes using screens and hydrocyclone. Thereafter it is once again fed into the slurry circuit and delivered to the TBM cutter head. Two SKC-60-K continuous mixing plants ensure continuous production of bentonite slurry.

Logistics has been a crucial success factor, according to the company. On site, all necessary tools, machine components and construction site equipment, as well as qualified personnel, had to be in the right place at the right time for assembly and commissioning.

Factory acceptance testing took place in Immenstadt, where 25 trucks were loaded in only five working days. Commissioning was done in Switzerland, where every truck arrived at the construction site as scheduled.

For more information on companies in this article

Related Content

  • Success of hot mix asphalt road recycling
    March 7, 2012
    Russian construction firm Kamdorstroy has carried out a successful demonstration of recycling techniques to over 60 highway officials, academics and contractors from all over the CIS states. The demonstration was carried out in co-operation with the Russian Federal Highway and Tatarstan Highway authorities and involved milling, recycling and overlaying a road with hot mix asphalt. The work was carried out on a 7.5m wide roadway with 3.8m wide lanes (with an overlap) using machinery and techniques new to Rus
  • Scotland to trial an all-electric road gritter unit from Bucher
    November 15, 2019
    Transport for Scotland will be trialling an all-electric gritter unit from Swiss company Bucher Municipal along the Forth Bridges this winter. The Electra 100% Electric Gritter: SEIV 19 – 350 is a version of Bucher’s Phoenix Electra in which a 48V electrical system replaces the usual hydraulic systems. It is powered by a lithium battery and brushless motors with dedicated and integrated inverter. Bucher says that the set-up avoids power losses and allows independent and proportional energy absorptions and
  • A bridge of hope?
    July 18, 2012
    As Russia prepares for a major Asia Pacific conference in nearly four years' time, the economic climate is felt in other countries in the region. Patrick Smith reports AUS$1 billion-plus suspension bridge is to be built to link the city of Vladivostok in the far east of Russia and Russky Island. Russia's President Dmitry Medvedev has signed an instruction for construction of the 3,150m long bridge, which is intended to provide access to the 24th Asia Pacific Economic Cooperation (APEC) summit, to be held o
  • DSS Group invests in Hitachi ZX670LC-5 excavator
    August 23, 2013
    One of Poland’s largest aggregates producers, DSS Group, has purchased a new Hitachi ZX670LC-5 for its quarry at Pilawa Górna in Lower Silesia. The company took delivery of the Zaxis-5 large excavator from Polish Hitachi dealer Tona in January 2013 as a key part of its strategy for aggregates production at the site. The DSS Group – owned by Dolnolskie Surowce Skalne SA – is the largest domestic producer of crushed aggregates for infrastructure projects. It has a 30-year licence to extract amphibolite (a