Skip to main content

Manitowoc crane helps construct new Illinois bridge

A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois. The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC
December 15, 2017 Read time: 3 mins
A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois.
A barge-mounted crane from 2123 Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois.


The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC system, one of the important selling points was the crane’s barge capabilities. The reduced footprint and floating counterweight better suits the machine to barge-mounting. Contracting teams can fit the crane onto smaller barges as the machine adjusts its centre of gravity for each lift.

The job is to replace the 756.6m-long Savanna-Sabula Bridge and the Illinois DOT hired the Plain, Wisconsin-based company to construct the new bridge. Spanning the Mississippi River between Savanna and the island community of Sabula, Iowa, the project involves the construction of two 300.4m-long outer plate girder spans and a central 166.4m-long tied-arch span. During planning, Kraemer realised that a barge-mounted crane solution would be necessary to access the lifts for the tied-arch span.

The company sought consultation from Dawes Rigging & Crane Rental (Dawes) about a crane that could be mounted on the tight working quarters of a barge, but still provide high-capacity lifting.

Milwaukee-based Dawes suggested a crane that could automatically adjust its counterweight to provide greater stability for each lift but with a smaller footprint than earlier cranes. The MLC300 was selected for the job and is now erected on a barge measuring 21.3m by 59.4m in the Mississippi River. It is lifting 68.5tonne arch rib sections to a height of 50.3m using 89.9m of main boom, all from a 30.5m radius. To meet the lift radius and pick weight requirements on the job, Kraemer’s MLC300 had to be outfitted with its optional VPC-MAX attachment, which enhances the crane’s capacity and enables additional boom and jib length combinations.

Kraemer rented the MLC300 from Dawes Rigging & Crane Rental, a member of the ALL Family of Companies.

Construction of the $80 million Savanna-Sabula Bridge replacement began in March of 2017 and is on schedule for completion in 2018. The new bridge will span 750.7m in length and will meet modern-day deck-width standards to improve the flow of two-lane traffic.

For more information on companies in this article

Related Content

  • Giving credence for Clearwater revival
    October 29, 2018
    The Minnesota Highway 24 Bridge spanning the Mississippi River at Clearwater is not a major structure. However, it does play a key role as the 376.4m-long bridge links US Highway 10 and Interstate 94. These routes run parallel on opposite sides of the Mississippi River and connect St Cloud to Minneapolis. There was a need to replace the old bridge, built in the 1950s, as it has been designated functionally obsolete, while it featured a restricted maximum load of 36.3tonnes. The price tag to demolish and
  • Montreal’s new Champlain Bridge is shaping up for Christmas
    September 10, 2018
    Montreal’s Champlain Bridges - one going up, one coming down, reports David Arminas The importance of the new Champlain Bridge to Montreal and Canada can’t be overstated, given the crumbling nature of the not-so-old original Champlain Bridge. The original steel truss affair across the St Lawrence River and the adjacent St Lawrence Seaway canal is “a lifeline for residents and businesses” in greater Montréal, according to the national Auditor General - the public sector spending watchdog. “It accommodates
  • Moscow crane deal for Manitowoc
    June 25, 2018
    Moscow-based crane rental company TOPKRAN-RENT has purchased four new Potain Hup cranes The deal is of note as these are the first units of this type to be sold in Russia. The four new Hup 40-30 self-erecting cranes are being put to work on a four-month project in the capital. TOPKRAN-RENT is already familiar with the Potain self-erecting cranes from Manitowoc, having previously purchased several Igo 50 cranes – the biggest model in the Igo range. Like the existing Igo cranes from the firm, the new Hup r
  • Manitowoc launches new MLC165 crawler crane in the U.S. at Conexpo 2014
    January 20, 2014
    Manitowoc will launch its 165tonne MLC165 lattice-boom crawler crane on to the U.S. market during Conexpo 2014. The MLV165 will be joined by two completely new crawler cranes – with Manitowoc keeping their details under wraps until the show.Designed for the global market, the MLC165 was first shown at the bauma 2013 exhibition in Munich, Germany.