Skip to main content

Mabey helps deliver bypass in congested UK city

The new Aberdeen Western Peripheral Route will cut journey times, reduce pollution costs and improve safety. Mabey has announced that its UK Hire business is working on a vital project to build a 58km bypass in Aberdeen. The Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T) project is being delivered by Transport Scotland in partnership with Aberdeen City Council and Aberdeenshire Council. Aberdeen Roads Limited was awarded the contract to build the AWPR/B-T in December 2014 and has appointed
February 9, 2018 Read time: 2 mins
The new Aberdeen Western Peripheral Route will cut journey times, reduce pollution costs and improve safety. Mabey has announced that its UK Hire business is working on a vital project to build a 58km bypass in Aberdeen.


The Aberdeen Western Peripheral Route/Balmedie-Tipperty (AWPR/B-T) project is being delivered by 4068 Transport Scotland in partnership with Aberdeen City Council and 3201 Aberdeenshire Council. Aberdeen Roads Limited was awarded the contract to build the AWPR/B-T in December 2014 and has appointed AWPR Construction Joint Venture, comprising 1146 Balfour Beatty, 2435 Carillion and Galliford Try, to build the 58km road.

Using experience from last year’s Mersey Gateway project, Mabey was brought onto the project to provide temporary support structures for the precast concrete beams for a number of the 75 structures to be built across the project. These beams form the bridge decks as they are craned into position and while the permanent concrete cross-head beams are constructed.

The scheme combines a number of Mabey’s industry-leading propping and jacking systems. As a result, the company’s dedicated fabrication unit has produced around 200tonnes of equipment specifically for this project.

For more information on companies in this article

Related Content

  • New structure for A46 bypass
    January 10, 2025
    A new concrete structure is being built for the UK’s A46 bypass.
  • Bridges in Sunderland and Poland are being slid into place
    February 6, 2017
    Sunderland sees a bridge slide into place and two bridges inch their way across a Polish highway Slowly but surely, a 2,500 tonne section of a new bridge deck was eased out from the banks of the River Wear near Sunderland in northern England. It now straddles the water, pointing towards the opposite bank which it will eventually reach after another sliding operation likely to take place next year. The project to build the New Wear Crossing is now halfway through with the first half of the steel deck b
  • New third Don River bridge project planned for Aberdeen
    August 27, 2014
    A new bridge is planned for the Scottish city of Aberdeen, centre of the country’s oil industry. Continued growth in the city from the oil industry is fuelling an increase in vehicle numbers, with congestion a serious problem. As a result, Aberdeen City Council has given a contract to Balfour Beatty to construct the Third Don Crossing at a cost of some €17.6 million (£14.3 million). The two existing crossings to the north of the city centre suffer heavy congestion at peak periods at present and this new bri
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra