Skip to main content

Liebherr's tunnelling twins

Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.
February 13, 2012 Read time: 2 mins
A Swiss tunneling job was carried out with precision and productivity with help coming from two Liebherr piling rigs as well as other Liebherr machines
Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.

The two 718 Liebherr drilling rigs were used to install a secant pile wall for slope and foundation pit reinforcement.

The 3.3km Tunnel de Choindez is being built between the border of Jura and Delémont to the east, and the link is due to open in 2016.

Both Liebherr units are working at the 300m-long northern entrance, while two Liebherr crawler cranes (an HS835 and an HS841) as well as a Liebherr R944 crawler excavator are being used for other work at the site.

The tunnel requires the installation of 20,000 linear metres of piles to form a secant drilled pile wall within 9 months. The 1,020 piles vary in length from 13-26m, with diameters of 1m. The soil on site consists of sandstone and marl layers. The machines have conventional Kelly-type shock absorbers with springs and hydraulic dampers to prevent damage to the material and to reduce noise emissions. Exchangeable drive adapters provide compatibility with other Kelly bar dimensions.

Due to their low operating weight of around 95tonnes for the LB28 and 115tonnes for the LB36 as well as the comparatively compact design, the machines were transported to the site quickly while set-up times were also fast. And due to the high performance of the LB rigs and the efficient project management, the job at the Courrendlin site was completed well ahead of the projected deadline.

For more information on companies in this article

Related Content

  • New innovations for crushing and screening equipment market
    September 16, 2015
    Mobile crushing and screening solutions have become a key component for the aggregate production sector - Mike Woof writes. The market for mobile crushing and screening solutions has grown enormously in recent years. With the first track-mounted mobile units having appeared in the 1980s and pioneered by a small number of manufacturers, the range and variety of units on the market has grown enormously since.
  • Enter the dragon: Changsha International Construction Equipment Exhibition
    July 12, 2019
    Changsha - one of China’s megacities - welcomed the global construction fraternity to the recent and first Changsha International Construction Equipment Exhibition
  • Tunnel for Colombia’s Calarca – Cajamarca Highway
    May 23, 2014
    A new tunnel is forming an important link for a major Colombian highway - Mauro Nogarin reports Work on a major highway project is underway in Colombia, forming part of the Bogota-Buenaventura Corridor. The highway has a length of 503km and is located in central Colombia, connecting the departments of Tolima and Quindio, across the central Andes, with a total cost of around US$330 million. A key section of the project consists of building a unidirectional tunnel of approximately 8.65km in length. Anot
  • Presidio Parkway: the Golden Gate Bridge’s new southern approach road
    May 29, 2013
    Work on the Presidio Parkway, a new breathtaking and eco-friendly southern approach road to San Francisco’s Golden Gate Bridge, has entered its crucial second and final phase. As Guy Woodford reports, the vital US$1 billion project has overcome legal as well as environmental challenges to stay on course for its expected 2016 completion Just after 9pm on Friday April 27, 2012 a large public crowd looked on excitedly as a fleet of more than 40 R&L Brosamer and Ferma Corporation deployed hydraulic demolition h