Skip to main content

Liebherr's tunnelling twins

Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.
February 13, 2012 Read time: 2 mins
A Swiss tunneling job was carried out with precision and productivity with help coming from two Liebherr piling rigs as well as other Liebherr machines
Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.

The two 718 Liebherr drilling rigs were used to install a secant pile wall for slope and foundation pit reinforcement.

The 3.3km Tunnel de Choindez is being built between the border of Jura and Delémont to the east, and the link is due to open in 2016.

Both Liebherr units are working at the 300m-long northern entrance, while two Liebherr crawler cranes (an HS835 and an HS841) as well as a Liebherr R944 crawler excavator are being used for other work at the site.

The tunnel requires the installation of 20,000 linear metres of piles to form a secant drilled pile wall within 9 months. The 1,020 piles vary in length from 13-26m, with diameters of 1m. The soil on site consists of sandstone and marl layers. The machines have conventional Kelly-type shock absorbers with springs and hydraulic dampers to prevent damage to the material and to reduce noise emissions. Exchangeable drive adapters provide compatibility with other Kelly bar dimensions.

Due to their low operating weight of around 95tonnes for the LB28 and 115tonnes for the LB36 as well as the comparatively compact design, the machines were transported to the site quickly while set-up times were also fast. And due to the high performance of the LB rigs and the efficient project management, the job at the Courrendlin site was completed well ahead of the projected deadline.

For more information on companies in this article

Related Content

  • Tunnel project of Chilean capital Santiago
    April 8, 2015
    Tunnel construction in Chilean capital Santiago will help cut chronic congestion – Mauro Nogarin & Mike Woof write. Chile’s capital Santiago is a thriving city having benefited from the country’s economy growing strongly in recent years. The massive copper mining sector has helped boost the country’s GDP significantly in the past few decades, also aided by the growing international reputation of Chile’s large wine industry. The steady economic growth has resulted in an equally steady growth in average incom
  • New Midtown Tunnel open in Virginia
    January 30, 2017
    A project to construct the second Midtown Tunnel link in the US state of Virginia alongside the original connection has taken an important step forward – Mike Woof writes Commuters in the US state of Virginia will be pleased that the new Midtown Tunnel is now open to traffic, as it will help to boost capacity and cut congestion on the busy US 58 route connecting Norfolk and Portsmouth. The 1.13km tunnel link has been built to link with the interchange at Brambleton Avenue and Hampton Boulevard in Norfolk
  • Tunnelling option for XCMG
    May 30, 2018
    XCMG’s largest tunnel machine, the XTR7/360, has gone straight from the production line to a reconstruction project in a county in Hunan Province. The project is for a tunnel with a full length of 1.2km, an excavation section width of 4.6m, and a height of 6.6m. Above the tunnel are residential buildings and pavement, buried for a depth of about 4m. These buildings have strict requirements on the disturbance on surrounding rock and noise control. The tunnel stratum is all rock roadways. The rocks are limes
  • Sandvik construction machines helping build Hong Kong tunnel link
    October 11, 2017
    Machines from Sandvik are playing important roles in the construction of a new tunnel connection to Hong Kong. The Liantang/Heung Yuen Wai Boundary Control Point (BCP for short) is a series of infrastructure projects that will see the construction of the latest land crossing between Shenzhen in China and Hong Kong. This project includes the construction of highways and tunnels. The crushing and drilling equipment from Sandvik Mining and Rock Technology being used for the work is being supported by Sandvik’