Skip to main content

Liebherr's tunnelling twins

Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.
February 13, 2012 Read time: 2 mins
A Swiss tunneling job was carried out with precision and productivity with help coming from two Liebherr piling rigs as well as other Liebherr machines
Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.

The two 718 Liebherr drilling rigs were used to install a secant pile wall for slope and foundation pit reinforcement.

The 3.3km Tunnel de Choindez is being built between the border of Jura and Delémont to the east, and the link is due to open in 2016.

Both Liebherr units are working at the 300m-long northern entrance, while two Liebherr crawler cranes (an HS835 and an HS841) as well as a Liebherr R944 crawler excavator are being used for other work at the site.

The tunnel requires the installation of 20,000 linear metres of piles to form a secant drilled pile wall within 9 months. The 1,020 piles vary in length from 13-26m, with diameters of 1m. The soil on site consists of sandstone and marl layers. The machines have conventional Kelly-type shock absorbers with springs and hydraulic dampers to prevent damage to the material and to reduce noise emissions. Exchangeable drive adapters provide compatibility with other Kelly bar dimensions.

Due to their low operating weight of around 95tonnes for the LB28 and 115tonnes for the LB36 as well as the comparatively compact design, the machines were transported to the site quickly while set-up times were also fast. And due to the high performance of the LB rigs and the efficient project management, the job at the Courrendlin site was completed well ahead of the projected deadline.

For more information on companies in this article

Related Content

  • Liebherr’s new MDC3 smart camera for Sandvik roadheaders
    October 24, 2022
    Liebherr’s MDC3 digital smart camera has been chosen by Sandvik for use on its tunnelling and underground mining machines.
  • Innovations in piling technology
    December 15, 2017
    The market for piling machines is seeing new technology come to market – Mike Woof writes UK firm BSP is now offering an improved range of piling systems, with its SL30 model and compact BH120. The SL30 can be used to drive Z piles in pairs and its hammer has a drop weight of 2.5tonnes, delivering an impact energy of 30kNm at up 84blows/minute. The SL piling hammer is designed for driving sheet piles and small bearing piles and is available with legs and inserts for use when freely suspended or with back
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.