Skip to main content

Liebherr's tunnelling twins

Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.
February 13, 2012 Read time: 2 mins
A Swiss tunneling job was carried out with precision and productivity with help coming from two Liebherr piling rigs as well as other Liebherr machines
Contractor Marti Tunnelbau has carried out work on the A16 road construction project in the Swiss canton of Jura with help from its Liebherr LB28 and LB36 piling rigs.

The two 718 Liebherr drilling rigs were used to install a secant pile wall for slope and foundation pit reinforcement.

The 3.3km Tunnel de Choindez is being built between the border of Jura and Delémont to the east, and the link is due to open in 2016.

Both Liebherr units are working at the 300m-long northern entrance, while two Liebherr crawler cranes (an HS835 and an HS841) as well as a Liebherr R944 crawler excavator are being used for other work at the site.

The tunnel requires the installation of 20,000 linear metres of piles to form a secant drilled pile wall within 9 months. The 1,020 piles vary in length from 13-26m, with diameters of 1m. The soil on site consists of sandstone and marl layers. The machines have conventional Kelly-type shock absorbers with springs and hydraulic dampers to prevent damage to the material and to reduce noise emissions. Exchangeable drive adapters provide compatibility with other Kelly bar dimensions.

Due to their low operating weight of around 95tonnes for the LB28 and 115tonnes for the LB36 as well as the comparatively compact design, the machines were transported to the site quickly while set-up times were also fast. And due to the high performance of the LB rigs and the efficient project management, the job at the Courrendlin site was completed well ahead of the projected deadline.

For more information on companies in this article

Related Content

  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Highway 99 revisited
    March 6, 2024
    David Arminas recently returned to Seattle for an inside look at some of the features of the now-complete SR99 tunnel that was a World Highways key project report in November 2017.
  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • Liebherr R 980 SME crawler excavator for quarry
    January 12, 2017
    The German family-run company Pongratz Schotterwerk, in Ensdorf-Wolfsbach/Bavaria, has been using a Liebherr R 980 SME crawler excavator in a limestone quarry since May. The 100tonne excavator - which replaces an R 954 S-HD - is working at the quarry face loading dumper trucks. Developed and manufactured in Colmar, eastern France, the Liebherr crawler excavator has an operating weight of around 100tonnes. The 420kW diesel engine complies with the exhaust emissions standards of Stage IIIB/tier 4i. After b