Skip to main content

Liebherr tower cranes operating at Santiago airport

the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types. The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of a
January 14, 2019 Read time: 3 mins
A total of 23 Liebherr tower cranes are being used for the airport expansion project in Santiago de Chile

718 Liebherr is supplying no less than 23 tower cranes for use on the airport expansion project in Santiago de Chile. The 5177 Vinci-1324 Astaldi consortium working on the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types.

The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of another terminal. Once finished, the airport will increase its total capacity to 30 million passengers/year, more than doubling its present number. There will be 67 passenger bridges in total, including the 18 already in use. In addition, capacity for vehicle parking will double.

Liebherr Chile has already erected seven 250 EC-B 12 Litronic, four 150 EC-B 8 Litronic cranes and one 280 EC-H 16 Litronic crane. Six cranes from the Chilean dealer Maquinarias Cruz del Sur are also in use: one 280 EC-H 12 Litronic, two 200 EC-H 10 Litronic and three 90 EC-B cranes. The 18 tower cranes have a jib length of 45-60m; they have been working on the construction site, since the end of 2016, with much  of the work now completed.

More Liebherr tower cranes will follow for the construction of the multi-storey car parks; three 110 EC-B 6 and two 154 EC-H cranes.

The location of a Liebherr branch in Santiago was a key factor for the Vinci-Astaldi consortium. In addition to the Liebherr tower cranes from its own fleet, the dealer Maquinarias Cruz del Sur is providing assembly, service and crane operators for all cranes.

The Liebherr Tower Cranes Solutions project department has provided the consortium with guidance for planning the most economical coverage of the construction site.

In airport construction, the permitted crane heights are very limited. In order to work with several cranes in tight spaces, the technicians mounted a Flat-Top 250 EC-B 12 Litronic crane on rails to build one of the terminals. This allows the crane to cover a large area, while it can also be moved to a position where it can slew freely. As a safety measure, all cranes are equipped with an anti-collision system from French manufacturer AMCS.

For more information on companies in this article

Related Content

  • Paso de las Leña tunnel between Argentina and Chile
    December 22, 2016
    A new tunnel between Chile and Argentina will boost trade and transport between the two countries - Mauro Nogarin writes The international Tunnel Paso Las Leñas will stretch 11.5km at 2,050m above sea level through the Andes. Once complete, it will greatly improve the connectivity and integration between the Chilean O'Higgins region with the Argentine Mendoza region.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Upgrades to Fort McMurray airport will aid Canada’s oil industry
    August 21, 2013
    Canada’s vast tar sands operation is providing a major financial boost to the country and this industry has relied heavily on Fort McMurray airport. Situated in Alberta, Fort McMurray is a remote town that has seen a huge expansion following the upturn in activity in the tar sands operations nearby. Although the massive resource has been worked for decades, only in the last 15 years or so have new extraction methods made the operation truly economic. Since 2010 Fort McMurray’s population has increas