Skip to main content

Liebherr tower cranes operating at Santiago airport

the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types. The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of a
January 14, 2019 Read time: 3 mins
A total of 23 Liebherr tower cranes are being used for the airport expansion project in Santiago de Chile

718 Liebherr is supplying no less than 23 tower cranes for use on the airport expansion project in Santiago de Chile. The 5177 Vinci-1324 Astaldi consortium working on the Santiago Nueva Pudahuel International airport development is benefiting from the proximity of Liebherr’s branch location in Chile. At the moment, 18 of the 23 Liebherr tower cranes are in operation on the large-scale construction site. Of the machines in use, three are high-top models and 15 are flat-top types.

The airport in Santiago de Chile is expanding its position as a key hub airport for South America. The operators are extending the site to 265,000m² and have commissioned the construction of another terminal. Once finished, the airport will increase its total capacity to 30 million passengers/year, more than doubling its present number. There will be 67 passenger bridges in total, including the 18 already in use. In addition, capacity for vehicle parking will double.

Liebherr Chile has already erected seven 250 EC-B 12 Litronic, four 150 EC-B 8 Litronic cranes and one 280 EC-H 16 Litronic crane. Six cranes from the Chilean dealer Maquinarias Cruz del Sur are also in use: one 280 EC-H 12 Litronic, two 200 EC-H 10 Litronic and three 90 EC-B cranes. The 18 tower cranes have a jib length of 45-60m; they have been working on the construction site, since the end of 2016, with much  of the work now completed.

More Liebherr tower cranes will follow for the construction of the multi-storey car parks; three 110 EC-B 6 and two 154 EC-H cranes.

The location of a Liebherr branch in Santiago was a key factor for the Vinci-Astaldi consortium. In addition to the Liebherr tower cranes from its own fleet, the dealer Maquinarias Cruz del Sur is providing assembly, service and crane operators for all cranes.

The Liebherr Tower Cranes Solutions project department has provided the consortium with guidance for planning the most economical coverage of the construction site.

In airport construction, the permitted crane heights are very limited. In order to work with several cranes in tight spaces, the technicians mounted a Flat-Top 250 EC-B 12 Litronic crane on rails to build one of the terminals. This allows the crane to cover a large area, while it can also be moved to a position where it can slew freely. As a safety measure, all cranes are equipped with an anti-collision system from French manufacturer AMCS.

For more information on companies in this article

Related Content

  • Benin airport job for Topcon’s RD-M1 scanner
    May 13, 2022
    A $16 million runway project at Cotonou Cadjehoun Airport needed Topcon Positioning’s RD-M1 road scanner to ensure precise milling and quality resurfacing.
  • Airport expansion for the Maldives assisted by Trimble
    September 6, 2019
    An airport redevelopment and expansion project in the Maldives has been assisted by the use of technology from Trimble. In 2016 the Chinese firm Beijing Urban Construction Group (BUCG) was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives, which is part of the Indian Ocean island group. The massive US$440 million expansion and land reclamation work is intended to boost capacity at the Maldives Airport. BUCG has utilised Trimble field solu
  • Easy operating
    July 31, 2012
    Modern asphalt plants are a far cry from the early models, and are capable of producing a wide variety of mixes at the touch of a button. Patrick Smith reports Cutting-edge software-based control technology makes today's asphalt mixing plants simple and efficient to operate. The tightening of clean air regulations is reducing the emissions from the plants, and the current focus is on the goal of raising the processed portion of reclaimed asphalt (RA) towards 100%, says Ammann Group, which has been involved
  • Oman’s US$765mn Salalah airport project takes shape
    June 25, 2013
    New roads and bridges are part of the US$765 million Salalah International Airport project in Oman RMD Kwikform Oman has supplied Larsen & Toubro Oman with a shoring solution to support construction of the new airport, which, once complete, will cater services for up to 1 million passengers/year. The project will involve the construction of a passenger terminal building, an air traffic control tower, and eight ancillary buildings, roads, and bridges. Located in the southern region of Oman, Salalah is a popu