Skip to main content

Kijlstra’s new culverts expand its production portfolio

A new mould is now in operation for Kijlstra in its UK factory, allowing the firm to produce a larger range of culverts. The specialist precast concrete drainage manufacturer says that the new moulds also allow for faster production and lead times. As the new moulds are adaptable a wider range of culvert configurations can be offered. The firm can now produce a range of sizes up to 2.1m in height and 3.6m in width, with a standard wall and slab thickness of 250mm.
October 12, 2017 Read time: 1 min

A new mould is now in operation for 7049 Kijlstra in its UK factory, allowing the firm to produce a larger range of culverts. The specialist precast concrete drainage manufacturer says that the new moulds also allow for faster production and lead times. As the new moulds are adaptable a wider range of culvert configurations can be offered. The firm can now produce a range of sizes up to 2.1m in height and 3.6m in width, with a standard wall and slab thickness of 250mm. Prior to leaving the factory the units are fitted with a rubber gasket seal so that a contractor does not have to prepare and prime the connections to fit jointing material, allowing a quick and easy push-fit installation.

For more information on companies in this article

Related Content

  • Safer highway containment continues to grow
    March 8, 2012
    A steady flow of new technology and systems is ensuring the highway barrier sector is seeing major gains in safety. Mike Woof reports A combination of technological development and tougher regulations are ensuring a constant flow of new safety barrier solutions for the highway sector. Issues such as containment and deflection are high on the technical agenda, while a wide array of technologies is being developed to meet specific needs for certain applications. Both in the US and Europe, an increased focus o
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Rubber tyred rollers see key developments
    June 23, 2015
    A series of new rubber tyred asphalt compactors are now coming to market from several key manufacturers - Mike Woof writes Several of the major European compactor manufacturers are introducing new rubber tyred machines to meet demand. Pneumatic tyred rollers are often used for finishing work in road construction, due to the high quality surface they can deliver.