Skip to main content

Kijlstra’s new culverts expand its production portfolio

A new mould is now in operation for Kijlstra in its UK factory, allowing the firm to produce a larger range of culverts. The specialist precast concrete drainage manufacturer says that the new moulds also allow for faster production and lead times. As the new moulds are adaptable a wider range of culvert configurations can be offered. The firm can now produce a range of sizes up to 2.1m in height and 3.6m in width, with a standard wall and slab thickness of 250mm.
October 12, 2017 Read time: 1 min

A new mould is now in operation for 7049 Kijlstra in its UK factory, allowing the firm to produce a larger range of culverts. The specialist precast concrete drainage manufacturer says that the new moulds also allow for faster production and lead times. As the new moulds are adaptable a wider range of culvert configurations can be offered. The firm can now produce a range of sizes up to 2.1m in height and 3.6m in width, with a standard wall and slab thickness of 250mm. Prior to leaving the factory the units are fitted with a rubber gasket seal so that a contractor does not have to prepare and prime the connections to fit jointing material, allowing a quick and easy push-fit installation.

For more information on companies in this article

Related Content

  • Tunnelling challenge on German project
    June 13, 2012
    A massive construction project has been underway deep in the heart of the Schnecktal valley area in Germany. From the surface, though, you would never be able to tell. The majority of the work is underground, as a joint-venture team led by German contractor Wayss and Freytag Ingenieurbau builds the nearly 7km long Finne Tunnel. After a few years of tunnel boring operations, the contractor is at work finishing the interior of the tunnel, slipforming first the tunnel’s floor and then a walkway with its GOMACO
  • An array of crushing and screening innovations was presented at the recent INTERMAT 2012 exhibition
    July 19, 2012
    The crushing and screening phase is a crucial component in aggregate production and new development will help optimise performance - Mike Woof reports Crushing and screening is a key part of the quarrying cycle and has a huge impact on overall operating performance. Optimising operations will cut running costs, reduce materials wastage and also provide a more consistent product quality, boosting cost-effectiveness dramatically. An array of innovations were revealed to the market at the recent INTERMAT 2012
  • Effective stabilisation
    February 24, 2012
    Contractor BAM Nuttall and specialist piling sub contractor Aarsleff Piling, have been working closely to develop a cost-effective solution to a tricky piling problem. The two firms have developed an alternative and versatile technique to reduce the risk of delays installing 2,150 precast concrete piles along part of the route of an innovative guided busway in Cambridgeshire in the UK.
  • G&Z launching new concrete placer
    March 3, 2015
    New material placer being introduced by G&Z – Mike Woof writes. Guntert & Zimmerman is now lifting the wraps from its new MP550 material placer, having announced last year that design work was underway. This machine is designed to boost throughput and overall productivity on site, while being versatile, easy to maintain and service and offering low running costs. According to the firm, the MP550 is the most versatile material placer on the market as it can handle a wide variety of concrete slumps as well as