Skip to main content

Junction construction

Two Liebherr mobile cranes and four Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo.
February 7, 2012 Read time: 3 mins
Two Liebherr cranes and four Atlas Copco compressors are carrying out important duties on a road upgrade project in Brazil
Two 718 Liebherr mobile cranes and four 161 Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo. 1564 CCR Autoban is using the Liebherr all-terrain cranes to lift the concrete-and-steel beams for a new cloverleaf junction being built on the Anhangüera Highway, one of the city's main road links. The machines were supplied by heavy-lift specialist IV Guindastes, which is one of Brazil's largest crane hire firms. The cranes are an LTM1500-8.1 with a maximum lift of 500tonnes and an LTM1220-5.2 with a lifting capacity of 242tonnes.

The Anhangüera Highway is being upgraded along a 6km stretch by highway concessionaire CCR Autoban, working under ARTESP (Agencia de Transporte do Estado de Sao Paulo). The project calls for the construction of three new clover interchanges, the upgrading of two others, and the construction of 14km of slip roads. Also included is the installation of five pedestrian bridges, and ancillary works.

The two Liebherr cranes are working on an interchange that will ease the flow of traffic where Mutinga Avenue, one of the main thoroughfares of the Pirituba and Santo Domingo districts in São Paulo, is bisected by the Anhangüera Highway.
The cranes are handling loads of up to 80tonnes, for the largest of the beams, with smaller beams weighing around 60tonnes. The cranes arrived on site in June 2010 and are being employed on a night time service since the roads are closed throughout lifting operations.

Meanwhile the four Atlas Copco compressors are being used by 1563 Serveng Civilsan to power equipment and clean machines being used on the highway.

The oil-injected, rotary screw, portable compressors are owned by sub-contractor Serveng Civilsan and are being used for multiple tasks including sand-blasting and powering small tools. An XAS77 compressor is being used at the base of the new interchange, while another XAS77 is located at Serveng Civilsan's workshop at the start of the section. Meanwhile two XAS137 units are located in the centre of the project, beside the main highway, where they are working side-by-side.

ARTESP is investing a total of US$150 million to upgrade the main junctions on Anhangüera Highway. This route is one of the most important highways in the State of Sao Paulo, and one of the busiest roads in Brazil, as it connects the state capital to the Campinas region, one of the economic hubs of the country. Mutinga Avenue is one of the main avenues of the neighbourhoods of Pirituba and Santo Domingo in São Paulo. The roads starts at Pirituba railway station and apart from being cut by the Anhanguera Highway, ends at Ribeirão Vermelho, on the border with the city of Osasco. CCR Autoban has the highway concession under contract to the São Paulo government, which is scheduled to end in 2026.

For more information on companies in this article

Related Content

  • RMD’s Hong Kong highway project
    June 13, 2012
    RMD Kwikform has supplied its 80kN Rapidshor shoring for the widening of the Tolo Highway, running between the Island House Interchange and Tai Hang in Hong Kong. The project, overseen by main contractor Gammon Construction and set to be completed by the end of 2013, will widen the Tolo Highway from a two to four-lane carriageway in each direction, alleviating traffic congestion. “We were approached by [project] sub-contractors, United Soundfair and Richwell Engineering to supply shoring and formwork suppor
  • Roadtec machines deliver Alaska runway rebuild
    January 26, 2017
    A challenging airport runway project in Alaska has been carried out with the help of Roadtec construction equipment equipped with Topcon machine control systems. Anchorage-based Knik Construction carried out the work at the airport in Yakutat, located in the southeast corner of Alaska. Bounded by the Gulf of Alaska to the South, mountains to the North, and coastal glaciers to the East and West, Yakutat is remote even for Alaska. There are no roads leading in or out and all commerce and access is by air o
  • Booming Chinese aggregate demand
    February 22, 2013
    Global demand for construction aggregates is set to increase 5.2% a year until 2015 to 48.3 billion tonnes, according to research by The Freedonia Group in the United States. The same source tips China alone to account for half of all new aggregate demand worldwide in the period 2010-2015. Guy Woodford reports on the growing importance of the Asian aggregates market. China is already the biggest nation for aggregate production and use in the world, and the competition among the giants of aggregate productio
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s