Skip to main content

Junction construction

Two Liebherr mobile cranes and four Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo.
February 7, 2012 Read time: 3 mins
Two Liebherr cranes and four Atlas Copco compressors are carrying out important duties on a road upgrade project in Brazil
Two 718 Liebherr mobile cranes and four 161 Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo. 1564 CCR Autoban is using the Liebherr all-terrain cranes to lift the concrete-and-steel beams for a new cloverleaf junction being built on the Anhangüera Highway, one of the city's main road links. The machines were supplied by heavy-lift specialist IV Guindastes, which is one of Brazil's largest crane hire firms. The cranes are an LTM1500-8.1 with a maximum lift of 500tonnes and an LTM1220-5.2 with a lifting capacity of 242tonnes.

The Anhangüera Highway is being upgraded along a 6km stretch by highway concessionaire CCR Autoban, working under ARTESP (Agencia de Transporte do Estado de Sao Paulo). The project calls for the construction of three new clover interchanges, the upgrading of two others, and the construction of 14km of slip roads. Also included is the installation of five pedestrian bridges, and ancillary works.

The two Liebherr cranes are working on an interchange that will ease the flow of traffic where Mutinga Avenue, one of the main thoroughfares of the Pirituba and Santo Domingo districts in São Paulo, is bisected by the Anhangüera Highway.
The cranes are handling loads of up to 80tonnes, for the largest of the beams, with smaller beams weighing around 60tonnes. The cranes arrived on site in June 2010 and are being employed on a night time service since the roads are closed throughout lifting operations.

Meanwhile the four Atlas Copco compressors are being used by 1563 Serveng Civilsan to power equipment and clean machines being used on the highway.

The oil-injected, rotary screw, portable compressors are owned by sub-contractor Serveng Civilsan and are being used for multiple tasks including sand-blasting and powering small tools. An XAS77 compressor is being used at the base of the new interchange, while another XAS77 is located at Serveng Civilsan's workshop at the start of the section. Meanwhile two XAS137 units are located in the centre of the project, beside the main highway, where they are working side-by-side.

ARTESP is investing a total of US$150 million to upgrade the main junctions on Anhangüera Highway. This route is one of the most important highways in the State of Sao Paulo, and one of the busiest roads in Brazil, as it connects the state capital to the Campinas region, one of the economic hubs of the country. Mutinga Avenue is one of the main avenues of the neighbourhoods of Pirituba and Santo Domingo in São Paulo. The roads starts at Pirituba railway station and apart from being cut by the Anhanguera Highway, ends at Ribeirão Vermelho, on the border with the city of Osasco. CCR Autoban has the highway concession under contract to the São Paulo government, which is scheduled to end in 2026.

For more information on companies in this article

Related Content

  • St Helena receiving airport upgrade
    June 30, 2014
    Two Liebherr machines, one LR 1200 crawler crane and one HS 895 HD duty cycle crawler crane, are currently employed in the construction of an international airport on Saint Helena. The island’s seclusion poses a particular challenge for this project Saint Helena, known as Napoleon’s last exile, is one of the oldest British colonies and is definitely one of the most remote places on earth. Located more than 2,000km from the African mainland in the South Atlantic Ocean, the British Overseas Territory Saint H
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.
  • $42 million surfacing: Brazil’s MS-347 highway
    June 16, 2025
    $42 million of surfacing work will be carried out for a stretch of Brazil’s MS-347 highway.
  • A tricky road update is planned for an important rural road in Brazil
    September 27, 2013
    Brazilian consultant SOTEPA has been closely involved with infrastructure improvements in a series of projects in the southern state of Santa Catarina. One of the most important of these has been design work for the SC-477 state highway, which connects the east of the state to Brazil’s Littoral zone and the BR-101 federal highway. The SC-477 has had to be upgraded as part of it has been unsurfaced, without an asphalt surface between Itaiópolis and Doutor Pedrinho. The road provides an important link for the