Skip to main content

Junction construction

Two Liebherr mobile cranes and four Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo.
February 7, 2012 Read time: 3 mins
Two Liebherr cranes and four Atlas Copco compressors are carrying out important duties on a road upgrade project in Brazil
Two 718 Liebherr mobile cranes and four 161 Atlas Copco compressors are playing an important role in upgrades to a highway in Brazilian city São Paolo. 1564 CCR Autoban is using the Liebherr all-terrain cranes to lift the concrete-and-steel beams for a new cloverleaf junction being built on the Anhangüera Highway, one of the city's main road links. The machines were supplied by heavy-lift specialist IV Guindastes, which is one of Brazil's largest crane hire firms. The cranes are an LTM1500-8.1 with a maximum lift of 500tonnes and an LTM1220-5.2 with a lifting capacity of 242tonnes.

The Anhangüera Highway is being upgraded along a 6km stretch by highway concessionaire CCR Autoban, working under ARTESP (Agencia de Transporte do Estado de Sao Paulo). The project calls for the construction of three new clover interchanges, the upgrading of two others, and the construction of 14km of slip roads. Also included is the installation of five pedestrian bridges, and ancillary works.

The two Liebherr cranes are working on an interchange that will ease the flow of traffic where Mutinga Avenue, one of the main thoroughfares of the Pirituba and Santo Domingo districts in São Paulo, is bisected by the Anhangüera Highway.
The cranes are handling loads of up to 80tonnes, for the largest of the beams, with smaller beams weighing around 60tonnes. The cranes arrived on site in June 2010 and are being employed on a night time service since the roads are closed throughout lifting operations.

Meanwhile the four Atlas Copco compressors are being used by 1563 Serveng Civilsan to power equipment and clean machines being used on the highway.

The oil-injected, rotary screw, portable compressors are owned by sub-contractor Serveng Civilsan and are being used for multiple tasks including sand-blasting and powering small tools. An XAS77 compressor is being used at the base of the new interchange, while another XAS77 is located at Serveng Civilsan's workshop at the start of the section. Meanwhile two XAS137 units are located in the centre of the project, beside the main highway, where they are working side-by-side.

ARTESP is investing a total of US$150 million to upgrade the main junctions on Anhangüera Highway. This route is one of the most important highways in the State of Sao Paulo, and one of the busiest roads in Brazil, as it connects the state capital to the Campinas region, one of the economic hubs of the country. Mutinga Avenue is one of the main avenues of the neighbourhoods of Pirituba and Santo Domingo in São Paulo. The roads starts at Pirituba railway station and apart from being cut by the Anhanguera Highway, ends at Ribeirão Vermelho, on the border with the city of Osasco. CCR Autoban has the highway concession under contract to the São Paulo government, which is scheduled to end in 2026.

For more information on companies in this article

Related Content

  • Liebherr extends rough terrain crane range
    April 9, 2018
    Unveiled at ConExpo 2017, Liebherr has extended its mobile crane product range with an additional series of rough terrain cranes in the 90tonne and 100tonne classes. The new rough-terrain crane LRT 1090-2.1 is said to feature high performance, safety and comfort. The VarioBase (variable support base) developed by Liebherr, which allows each individual outrigger beam to be extended to optional lengths, is standard on the LRT cranes. The crane model is powered by a Cummins diesel engine which develops 194kW
  • Brazil’s key projects gathering pace
    January 5, 2021
    Momentum is gathering for two key transport link projects in Brazil.
  • We can be Heroes
    January 11, 2023
    Paraguay’s Puente Héroes del Chaco will provide a vital transport link for the country once it is complete, Mauro Nogarin and Mike Woof report
  • Work begins on Stockholm’s new bypass
    August 22, 2016
    The first tunnels are being excavated for the huge bypass tunnel in Sweden’s capital Stockholm – Adrian Greeman writes. After years of preparation and design, blasting and rock moving for Sweden's largest infrastructure project began south of the city this year. It sets in train a decade-long project that will create a new half-ring dual three-lane motorway for the city, 20km long. With most of it deep underground, it will also be one of Europe's largest ever road tunnels. The scheme is aimed at transformin