Skip to main content

Irish bridge's CE marking

With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
February 14, 2012 Read time: 2 mins
Portumna Bridge during refurbishment
With the aid of services provided by 1398 Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking.

The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.

Spanning the Shannon River, the E2.2 million Portumna Bridge was originally built in 1911 and is part of the busy N65 route that links the counties of Galway and Tipperary.

When it was decided that this ageing but vital structure needed to be refurbished, Waterways Ireland awarded the order for design specification, contract preparation and project supervision to Royal Haskoning, who appointed L&M Keating to carry out the building and installation work.

Royal Haskoning recommended that Laidler Associates should be used to provide the consultancy services needed to ensure that the bridge met all relevant legal requirements and, in particular the requirements for CE marking. After these preliminary sessions, Laidler Associates carried out detailed hazard assessments covering all aspects of the bridge design and construction. Consultants from the company also visited the site during the construction work and, when the work was complete, they carried out a detailed final inspection before certifying the structure.

Jane Arbuckle, technical director, mechanical and electrical engineering at Royal Haskoning, said: "The regulatory compliance and certification work carried out for us by Laidler Associates went very smoothly."

For more information on companies in this article

Related Content

  • European OEMs to develop tech ref for EV charging infrastructure
    May 4, 2012
    The Renault Nissan Alliance, PSA Peugeot Citroën and Mitsubishi Motors have decided to develop and promote the technical reference for compliance of public recharging equipment for electric vehicles in Europe, based on the existing conformity brand 'EV Ready', originally launched by Renault and Schneider Electric.EV Rready aims at guaranteeing interoperability between the charging infrastructure and electric and rechargeable hybrid vehicles across Europe by means of a uniform scheme which is intended to cov
  • Road safety training partnership in Africa and South America
    February 14, 2012
    The World Bank Global Road Safety Facility and IRF work together to reduce the toll of road deaths and serious injuries in low and middle-income countries
  • Working towards safer India mobility...
    July 18, 2012
    Sibylle Rupprecht, IRF-GPC Director General, looks towards sound mobility management at the 3rd Regional Conference of the International Road Federation 3rd-4th October 2008 in New Delhi, India More than 1.2 million deaths and 23 million injuries are caused by road accidents worldwide every year. Of these, India accounts for 10% of fatal accidents. These alarming figures were disclosed by the speakers at the 3rd Regional IRF Conference on 'Mobility and Safety in Road Transport' to some 250 engineers and exp
  • Russia to become the world’s largest infrastructure market?
    February 20, 2012
    Russia should be one of the largest and most dynamic infrastructure markets in the world over the next 15 years, and now "the time is right to begin a major push." Patrick Smith reports