Skip to main content

Irish bridge's CE marking

With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
February 14, 2012 Read time: 2 mins
Portumna Bridge during refurbishment
With the aid of services provided by 1398 Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking.

The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.

Spanning the Shannon River, the E2.2 million Portumna Bridge was originally built in 1911 and is part of the busy N65 route that links the counties of Galway and Tipperary.

When it was decided that this ageing but vital structure needed to be refurbished, Waterways Ireland awarded the order for design specification, contract preparation and project supervision to Royal Haskoning, who appointed L&M Keating to carry out the building and installation work.

Royal Haskoning recommended that Laidler Associates should be used to provide the consultancy services needed to ensure that the bridge met all relevant legal requirements and, in particular the requirements for CE marking. After these preliminary sessions, Laidler Associates carried out detailed hazard assessments covering all aspects of the bridge design and construction. Consultants from the company also visited the site during the construction work and, when the work was complete, they carried out a detailed final inspection before certifying the structure.

Jane Arbuckle, technical director, mechanical and electrical engineering at Royal Haskoning, said: "The regulatory compliance and certification work carried out for us by Laidler Associates went very smoothly."

For more information on companies in this article

Related Content

  • Francis Scott Key Bridge demolition
    July 3, 2025
    Demolition is planned for the Francis Scott Key Bridge.
  • Importance of road/tunnel drainage systems
    April 10, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Importance of road/tunnel drainage systems
    May 8, 2012
    A variety of systems are available for quickly and efficiently removing water from roads as Patrick Smith reports. The presence of water in a highway layer reduces the bearing capacity of the road, and in doing so it also reduces the structure's lifetime. Indeed, the recent extremely cold winter in many parts of Europe has shown that in colder climates there is a risk of frost damage when water is present resulting in costly potholes, so drainage systems performing properly are important in road design.
  • Saudi Arabian capital Riyadh benefiting from major transport investment
    September 9, 2013
    Saudi Arabia is undergoing a series of upgrades to its transport network in a bid to improve Traffic flow rates and boost safety - Mike Woof reports. The massive growth in the use of motor transport worldwide since the start of the 20th century has transformed every country on the planet. But perhaps no country has changed more dramatically than Saudi Arabia, the world’s leading oil producer. At the start of the 20th century Saudi Arabia’s population was small and the country had few industries while it is