Skip to main content

Irish bridge's CE marking

With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
February 14, 2012 Read time: 2 mins
Portumna Bridge during refurbishment
With the aid of services provided by 1398 Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking.

The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.

Spanning the Shannon River, the E2.2 million Portumna Bridge was originally built in 1911 and is part of the busy N65 route that links the counties of Galway and Tipperary.

When it was decided that this ageing but vital structure needed to be refurbished, Waterways Ireland awarded the order for design specification, contract preparation and project supervision to Royal Haskoning, who appointed L&M Keating to carry out the building and installation work.

Royal Haskoning recommended that Laidler Associates should be used to provide the consultancy services needed to ensure that the bridge met all relevant legal requirements and, in particular the requirements for CE marking. After these preliminary sessions, Laidler Associates carried out detailed hazard assessments covering all aspects of the bridge design and construction. Consultants from the company also visited the site during the construction work and, when the work was complete, they carried out a detailed final inspection before certifying the structure.

Jane Arbuckle, technical director, mechanical and electrical engineering at Royal Haskoning, said: "The regulatory compliance and certification work carried out for us by Laidler Associates went very smoothly."

For more information on companies in this article

Related Content

  • ROPS excavator cabs now a reality
    February 9, 2012
    ISO-certified excavator ROPS cabs are coming for excavators. Mark Cherrington writes. It has been a long time coming, but certified ROPS cabs on excavators are now a reality. This follows the release of an international ISO standard that sets out laboratory tests and performance requirements for protective structures on excavators weighing from 6 - 50tonnes. In addition, an update to the EU's Machinery Safety Directive (MSD) took effect at the end of 2009 and brought in a number of changes, including a requ
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Machine visibility in focus from EU Commission
    November 9, 2015
    All round visibility from the operator’s seat of a construction machine is a topic in focus at the EU Commission. This has been a topic of concern for the construction machinery sector ever since the EU Commission released a warning relating to the standard. This standard has provisions covering visibility requirements for earth-moving machinery. A position paper is intended to help clarify the situation.
  • Sunderland’s New Wear Crossing takes shape
    February 16, 2017
    The New Wear Crossing will be the first bridge to be built over the River Wear in Sunderland, UK, for more than 40 years Raising the bridge’s 100m-tall pylon promised to be a stunning visual sight, but also a tricky operation dictated by extremely variable local weather. World Highways went to press just before the operation, but not before the pylon had arrived by barge on January 7. It had completed a two-day crossing of the often unpredictable North Sea from the Belgian port of Ghent where it was f