Skip to main content

Irish bridge's CE marking

With the aid of services provided by Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking. The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.
February 14, 2012 Read time: 2 mins
Portumna Bridge during refurbishment
With the aid of services provided by 1398 Laidler Associates the refurbished Portumna road bridge in Galway has become the first bridge in the Ireland to carry European CE marking.

The CE marking was needed because the swing bridge has moving parts, and falls within the scope of the Machinery Directive.

Spanning the Shannon River, the E2.2 million Portumna Bridge was originally built in 1911 and is part of the busy N65 route that links the counties of Galway and Tipperary.

When it was decided that this ageing but vital structure needed to be refurbished, Waterways Ireland awarded the order for design specification, contract preparation and project supervision to Royal Haskoning, who appointed L&M Keating to carry out the building and installation work.

Royal Haskoning recommended that Laidler Associates should be used to provide the consultancy services needed to ensure that the bridge met all relevant legal requirements and, in particular the requirements for CE marking. After these preliminary sessions, Laidler Associates carried out detailed hazard assessments covering all aspects of the bridge design and construction. Consultants from the company also visited the site during the construction work and, when the work was complete, they carried out a detailed final inspection before certifying the structure.

Jane Arbuckle, technical director, mechanical and electrical engineering at Royal Haskoning, said: "The regulatory compliance and certification work carried out for us by Laidler Associates went very smoothly."

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Promoting advances in sustainable roads worldwide
    April 12, 2012
    Professor Martin Snaith, O.B.E., introduces an annual gathering that has grown over the years to become perhaps the world's foremost professional development forum promoting advances in sustainable roads worldwide. Over more than 15 years the Senior Road Executives Programme (SRE), organised by the internationally renowned Highways Group of the University of Birmingham, UK, in association with IRF, has established a worldwide reputation for providing top-quality professional development for executives worki
  • GRAA focuses on winning project profile: Brisbane Airport Link, Northern Busway & Airport
    May 19, 2014
    The revolutionary AUD$4.8 billion Airport Link has delivered a landmark infrastructure project for Australia, tackling traffic congestion, enhancing the busway network and removing an infamous traffic bottleneck through an innovative and inspired design. The Airport Link in Brisbane, Australia included three separate projects – the Northern Busway (a 3km two-way dedicated busway), the Airport Roundabout Upgrade and the AirportlinkM7 (a 6.7km toll road including 5.2km of tunnel). Together, they represent the
  • PPRS Nice 2018: maintenance moves mountains
    June 22, 2018
    Strategic maintenance was a major theme at the second Pavement Preservation and Recycling Summit in Nice, France. The world is changing, mobility is changing and so roads must change and adapt for the future.” With this brief statement, Jacques Tavernier opened the second PPRS Summit. “At the same time there is a growing awareness of poor or non-existent maintenance for highways. The question for this conference is how to adapt road maintenance in the face of this challenge,” said Tavernier, in his role as