Skip to main content

Hats off to Polypipe

Ridgidrain allows pipe sections to be cut without affecting pipe integrity.
By David Arminas May 15, 2020 Read time: 2 mins
Polypipe’s “top hats” adorn a major expansion of England’s M4 motorway near London

Over 3.2km of Ridgidrain and 1,000 “top hat” chamber base connectors from Polypipe under have been laid under an M4 motorway project in the UK.

Highways England is investing US$1.1 billion to create a “smart” section of the M4 motorway near London. A joint venture between Balfour Beatty and VINCI subsidiaries VINCI Grands Projets and Taylor Woodrow is delivering the upgrades, including widening the motorway from three to four lanes, rebuilding 13 major structures and deploying active traffic management technologies.

The joint venture started drainage upgrade work in October 2018. It used Ridgidrain pipe is a non-pressure surface water and subsurface water structured-wall carrier drain system. It is manufactured to nominal stiffness SN6 and has a high crush-resistance and strength-to-weight ratio. This makes it ideal for stormwater applications where high traffic loads are expected. Integral sockets for easy pipe alignment make installation rapid and straightforward, says the manufacturer, Polypipe Civils and Infrastructure - one of Europe’s largest manufacturers of plastic piping systems.

“Ridgidrain allows for pipe sections to be cut to length to meet onsite requirements without affecting pipe integrity or the ability to link it with the other components of the motorway’s surface water management system,” says Guy Miller, a Taylor Woodrow engineer.

Plain-ended pipes are available in diameters between 100-600mm and internally-socketed versions from 400-900mm. Ridgidrain is the first twinwall surface water drainage system with Highways Authority Product Approval Scheme (HAPAS) up to diameters of 900mm.

When connecting the plastic subsurface network with concrete drainage elements on the surface of the motorway, the bespoke flange “top hat” chamber base connectors act as inlets and conduits for the slip-formed concrete slot drains sited along the central reservation, says John Moss, business development director, with Polypipe Civils.

Polypipe is also providing a combination of Ridgidrain and “top hat” connectors with bespoke flange connections for the next phase of the project. This involves installing surface water drainage along the grass verges flanking the carriageways.

The M4 smart motorway works are due to finish in 2022.

Related Content

  • Balfour Beatty supported Road Workers’ Safety Forum wins Royal Award
    December 20, 2013
    The Road Workers' Safety Forum (RoWSaF), a cross-industry group led by the Highways Agency and supported by Balfour Beatty and its joint ventures, has been recognised at the Prince Michael International Road Safety Awards for its innovative and collaborative approach to improving safety for road workers. The RoWSaF team collected the award from His Royal Highness Prince Michael of Kent at a ceremony at The Savoy in London.
  • Sheffield duty for a Miller PowerLatch
    June 3, 2019
    The Miller PowerLatch Tilt was recently the attachment of choice for Yorkshire-based engineering consultancy JN Bentley, part of global engineering consultancy Mott MacDonald.
  • Formwork plays a leading role in global infrastructure projects
    June 13, 2012
    New and highly regarded existing formwork systems have been used in major recent transport-related construction projects across the globe. Guy Woodford looks at some of their applications The multi-million dollar Mississippi River Bridge project in the United State is creating a vital new gateway between Illinois and Missouri. Central to the project is the realignment and reconstruction of Interstate 70 and a new landmark bridge, featuring two pylons projecting vertically from the Mississippi river bed w
  • Mongolia’s capital Ulaanbaatar is redeveloping its airport
    August 23, 2016
    Mongolia’s economy is growing fast, with capital Ulaanbaatar the centre for activity. Being landlocked, the country depends heavily on aviation to carry passengers and cargo. The existing Chinggis Khaan International Airport was built in 1956 and upgraded in 1987 and 1997 for international traffic. But the old airport cannot meet demands and boosting the country’s capacity to handle flights is essential. The New Ulaanbataar International Airport (NUBIA) will triple passenger capacity to approximately 3