Skip to main content

Hats off to Polypipe

Ridgidrain allows pipe sections to be cut without affecting pipe integrity.
By David Arminas May 15, 2020 Read time: 2 mins
Polypipe’s “top hats” adorn a major expansion of England’s M4 motorway near London

Over 3.2km of Ridgidrain and 1,000 “top hat” chamber base connectors from Polypipe under have been laid under an M4 motorway project in the UK.

Highways England is investing US$1.1 billion to create a “smart” section of the M4 motorway near London. A joint venture between Balfour Beatty and VINCI subsidiaries VINCI Grands Projets and Taylor Woodrow is delivering the upgrades, including widening the motorway from three to four lanes, rebuilding 13 major structures and deploying active traffic management technologies.

The joint venture started drainage upgrade work in October 2018. It used Ridgidrain pipe is a non-pressure surface water and subsurface water structured-wall carrier drain system. It is manufactured to nominal stiffness SN6 and has a high crush-resistance and strength-to-weight ratio. This makes it ideal for stormwater applications where high traffic loads are expected. Integral sockets for easy pipe alignment make installation rapid and straightforward, says the manufacturer, Polypipe Civils and Infrastructure - one of Europe’s largest manufacturers of plastic piping systems.

“Ridgidrain allows for pipe sections to be cut to length to meet onsite requirements without affecting pipe integrity or the ability to link it with the other components of the motorway’s surface water management system,” says Guy Miller, a Taylor Woodrow engineer.

Plain-ended pipes are available in diameters between 100-600mm and internally-socketed versions from 400-900mm. Ridgidrain is the first twinwall surface water drainage system with Highways Authority Product Approval Scheme (HAPAS) up to diameters of 900mm.

When connecting the plastic subsurface network with concrete drainage elements on the surface of the motorway, the bespoke flange “top hat” chamber base connectors act as inlets and conduits for the slip-formed concrete slot drains sited along the central reservation, says John Moss, business development director, with Polypipe Civils.

Polypipe is also providing a combination of Ridgidrain and “top hat” connectors with bespoke flange connections for the next phase of the project. This involves installing surface water drainage along the grass verges flanking the carriageways.

The M4 smart motorway works are due to finish in 2022.

Related Content

  • Underground routes for highways
    July 20, 2012
    Increasingly, and where possible, roads are being built in tunnels often for environmental reasons, writes Patrick Smith As part of the new M7 motorway development in the southwest of Ireland, the four-lane route crosses the River Shannon near Limerick, before it flows into the Atlantic. Centrepiece of the 10km long Limerick Southern Ring Road is the required tunnelling (675m long), which including the north and south entrance and exit ramps, means it will be 915m long. Completion of the work is planned for
  • Balfour Beatty wins €225mn UK motorway upgrade contract
    June 23, 2014
    Balfour Beatty has won a €225 million (£184 million) motorway upgrade contract from the Highways Agency. A total of 27.3kms (17 miles) on the M60 and M72 will be upgraded. The work includes converting the carriageway between junctions 18 and 20 on the M72 to a four-lane motorway. The carriageway stretch between junctions 8 and 12 on the M60 will also be upgraded. Employing around 1,000, the work is due to begin this month (July 2014) and be completed by autumn 2017.
  • Effective drainage construction with Kijlstra
    October 27, 2016
    Drainage products specialist drainage Kijlstra is introducing a novel push-fit drainage solution. This new jointing system allows fast assembly of drainage systems, reducing construction time. The new culverts from Kijlstra can help speed construction and civils installations and feature a novel rubber-sealed, push-fit jointing system. This is said to make installation quicker and simpler and avoids the need to apply primer and a jointing material to achieve a watertight finish, as with conventional units
  • $78 million Granite contract in CA
    February 17, 2025
    Granite construction is working on a $78 million contract in CA.