Skip to main content

Hats off to Polypipe

Ridgidrain allows pipe sections to be cut without affecting pipe integrity.
By David Arminas May 15, 2020 Read time: 2 mins
Polypipe’s “top hats” adorn a major expansion of England’s M4 motorway near London

Over 3.2km of Ridgidrain and 1,000 “top hat” chamber base connectors from Polypipe under have been laid under an M4 motorway project in the UK.

Highways England is investing US$1.1 billion to create a “smart” section of the M4 motorway near London. A joint venture between Balfour Beatty and VINCI subsidiaries VINCI Grands Projets and Taylor Woodrow is delivering the upgrades, including widening the motorway from three to four lanes, rebuilding 13 major structures and deploying active traffic management technologies.

The joint venture started drainage upgrade work in October 2018. It used Ridgidrain pipe is a non-pressure surface water and subsurface water structured-wall carrier drain system. It is manufactured to nominal stiffness SN6 and has a high crush-resistance and strength-to-weight ratio. This makes it ideal for stormwater applications where high traffic loads are expected. Integral sockets for easy pipe alignment make installation rapid and straightforward, says the manufacturer, Polypipe Civils and Infrastructure - one of Europe’s largest manufacturers of plastic piping systems.

“Ridgidrain allows for pipe sections to be cut to length to meet onsite requirements without affecting pipe integrity or the ability to link it with the other components of the motorway’s surface water management system,” says Guy Miller, a Taylor Woodrow engineer.

Plain-ended pipes are available in diameters between 100-600mm and internally-socketed versions from 400-900mm. Ridgidrain is the first twinwall surface water drainage system with Highways Authority Product Approval Scheme (HAPAS) up to diameters of 900mm.

When connecting the plastic subsurface network with concrete drainage elements on the surface of the motorway, the bespoke flange “top hat” chamber base connectors act as inlets and conduits for the slip-formed concrete slot drains sited along the central reservation, says John Moss, business development director, with Polypipe Civils.

Polypipe is also providing a combination of Ridgidrain and “top hat” connectors with bespoke flange connections for the next phase of the project. This involves installing surface water drainage along the grass verges flanking the carriageways.

The M4 smart motorway works are due to finish in 2022.

Related Content

  • UK widening contract awarded to
    September 21, 2015
    A joint venture formed of Balfour Beatty and Carillion has won the tender process for a €401 million (£292 million) road widening package in the UK. The joint venture will commence with preparatory works worth €686,680 (£500,000) initially as the main contract is subject to approval of the wider A14 improvement scheme. The aim of the joint venture’s work is to upgrade the A14 between Swavesey and Milton. This forms part of the wider A14 Cambridge to Huntingdon road improvement scheme. The joint venture is a
  • Cold road reclamation in South Africa
    July 18, 2012
    Raubex Construction’s new Cat RM500 rotary mixer is proving its worth on a road reclamation work on a South African highway Part of an extensive motorway network some 185km long, South Africa’s ongoing Gauteng Freeway Improvement Project (GIFP) is creating a modern, world-class toll route system. The new road will provide major impetus to socio-economic growth in the country’s most populous and commercially active region. Being built in stages by the South African National Roads Authority (SANRAL), these r
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • SBM concrete plants for Fehmarnbelt tunnel
    June 17, 2021
    The 18km Fehmarnbelt Fixed Link in the Baltic Sea will create an uninterrupted traffic link between the Danish island of Lolland and the German Island of Fehmarn.