Skip to main content

Hats off to Polypipe

Ridgidrain allows pipe sections to be cut without affecting pipe integrity.
By David Arminas May 15, 2020 Read time: 2 mins
Polypipe’s “top hats” adorn a major expansion of England’s M4 motorway near London

Over 3.2km of Ridgidrain and 1,000 “top hat” chamber base connectors from Polypipe under have been laid under an M4 motorway project in the UK.

Highways England is investing US$1.1 billion to create a “smart” section of the M4 motorway near London. A joint venture between Balfour Beatty and VINCI subsidiaries VINCI Grands Projets and Taylor Woodrow is delivering the upgrades, including widening the motorway from three to four lanes, rebuilding 13 major structures and deploying active traffic management technologies.

The joint venture started drainage upgrade work in October 2018. It used Ridgidrain pipe is a non-pressure surface water and subsurface water structured-wall carrier drain system. It is manufactured to nominal stiffness SN6 and has a high crush-resistance and strength-to-weight ratio. This makes it ideal for stormwater applications where high traffic loads are expected. Integral sockets for easy pipe alignment make installation rapid and straightforward, says the manufacturer, Polypipe Civils and Infrastructure - one of Europe’s largest manufacturers of plastic piping systems.

“Ridgidrain allows for pipe sections to be cut to length to meet onsite requirements without affecting pipe integrity or the ability to link it with the other components of the motorway’s surface water management system,” says Guy Miller, a Taylor Woodrow engineer.

Plain-ended pipes are available in diameters between 100-600mm and internally-socketed versions from 400-900mm. Ridgidrain is the first twinwall surface water drainage system with Highways Authority Product Approval Scheme (HAPAS) up to diameters of 900mm.

When connecting the plastic subsurface network with concrete drainage elements on the surface of the motorway, the bespoke flange “top hat” chamber base connectors act as inlets and conduits for the slip-formed concrete slot drains sited along the central reservation, says John Moss, business development director, with Polypipe Civils.

Polypipe is also providing a combination of Ridgidrain and “top hat” connectors with bespoke flange connections for the next phase of the project. This involves installing surface water drainage along the grass verges flanking the carriageways.

The M4 smart motorway works are due to finish in 2022.

Related Content

  • New Holland's motorway deployment
    February 6, 2012
    A fleet of compact and zero tailswing New Holland excavators has been deployed to assist with motorway crash barrier replacement work.
  • The road to climate change mitigation starts at Highways UK
    February 17, 2020
    David Arminas explored climate change innovation on display at Highways UK in Birmingham, England
  • Nigeria has built a major road link from concrete
    September 14, 2016
    A new concrete road is now open to traffic in Nigeria’s Kogi State. This is of note as the new 24km road is the now the country’s longest to be made from concrete. The new road was built in a joint venture partnership between Nigerian firm Dangote Construction and Brazilian company Andrade Gutierrez. The new road connects Kabba with Obajana. Part of the Dangote Group, Dangote Construction was well placed to carry out the work as it operates its Obajana Cement production facility, at Obajana. This new road
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.