Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Upbeat in Beijing for BICES number 15
    January 22, 2020
    This year’s BICES exhibition in Beijing showcased much machinery destined for export to emergent countries that are taking advantage of China’s Belt and Road Initiative
  • Xylem’s new facility in the Philippines
    June 26, 2018
    Xylem recently opened a new pump rental and service business in Calamba in the province of Laguna, Philippines. The site will serve the growing demand across the Philippines and South East Asia. It will also further expand Xylem’s footprint in the region and build on the company’s current manufacturing and sales operations in Calamba. Xylem’s proven Godwin and Flygt brands play a key role in dewatering and liquids transfer. The Philippines has mineral resources estimated at approximately $1 trillion and i
  • Moving the earth with improved environmental credentials
    August 9, 2018
    Driver comfort, more power and improved environmental credentials highlight some of the latest earthmoving equipment Doosan Construction Equipment has launched a new version of the company’s DA30 30tonne class articulated dump truck (ADT), now in a new colour scheme. Most of the changes are for better operator comfort and controllability of the machine. But there are also changes in the driveline and electrical systems. The most important development is an upgrade of the suspension to a hydro-gas self-lev
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past