Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Super job for a Demag CC 3800-1 without a Superlift counterweight
    July 4, 2019
    A Demag CC 3800-1 crane with an 84m-long main boom was recently set up in Germany without a Superlift counterweight to save space. The jobsite was the replacement of the old viaduct on the A45 Freeway that spans the Lahn River near Dorlar in Germany. Bietigheim-Bissingen-based crane service provider Wiesbauer solved the site’s space issues by using a Demag CC 3800-1. “This site required us to lift loads of 96-148tonnes at radii of 40-64m, so there was no option but to use a crawler crane in the 650tonne c
  • Potain’s MDT 219 tower crane suited for more complex sites
    January 23, 2017
    Potain’s MDT 219 has the highest capacity of all models in the MDT CCS City tower crane range, making it ideal for all types of complex projects in North America. Potain said that its MDT 219 has faster setup and configuration, enhanced operator controls and simplified maintenance and monitoring functions over previous generation tower cranes, says Jean-Noel Daguin, senior vice president of Potain tower cranes. All the cranes have Manitowoc’s exclusive Crane Control System (CCS), a user-friendly inter
  • Liebherr launches rough terrain cranes LRT 1090-2.1 and 1100-2.1
    March 7, 2017
    Liebherr announced at the CONEXPO-CON/AGG exhibition in Las Vegas that the company is back in the rough terrain crane market after a 30-year absence. The Swiss-based company is focusing on the North American market with the launch of two mobile crane models, said Daniel Pitzer, head of Liebherr USA.
  • Reliable lifting for Terex crane in Saudi Arabia
    October 5, 2018
    A Terex TR 90 rough terrain crane has performed reliably and productively in tough operating conditions in Saudi Arabia. The crane was used for lifting numerous components for drilling rigs, generators, and a power distribution and control centre at a site for Nabros in Abqaiq, in Saudi Arabia. The machine was provided by Saudi Arabia-based heavy equipment service provider Expertise Contracting Company. The crane was transported to the work site in Abqaiq on a lowbed trailer, which took three hours to t