Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Better roads through asphalt plant innovation
    August 19, 2014
    In Africa, one of the world’s fastest-growing cities is using the latest asphalt plant technology to boost its road maintenance work; while leading firms are finding their innovative solutions in demand in Europe and the Americas. Guy Woodford reports A new up to 180tonnes/hour Marini UltiMAP 2000 plant is helping Lagos State Public Works in Lagos, Nigeria implement a five-year strategic road map aiming to ensure high standards of road maintenance and improve infrastructural development across the city of m
  • Compaction in the field
    July 31, 2012
    Special applications require stringent quality control and with compaction machines a key part of the paving process, their contribution can be vital. A high quality finish has helped athletes breaking sporting records on the track at the Shanghai Stadium in China during this year's 2008 Summer Olympic Games. Built in 1997 the stadium has been the venue for numerous major sporting events prior to the Olympics, however its track was showing signs of wear and the local authorities decided that a full refurbis
  • Julián Núñez, head of ASECAP offers a little Spanish enlightenment
    May 1, 2018
    Julián Núñez, president of ASECAP, gets his teeth into the vision of a European strategy for toll roads. David Arminas reports from Madrid Getting European politicians to agree to a long-term cross-border highway infrastructure programme for toll roads is extremely difficult. It’s a bit like pulling teeth. People want to avoid the pain. This is perhaps a bad analogy to use in the case of Julián Núñez, president of ASECAP - European Association of Operators of Toll Road Infrastructures. Núñez had just sat
  • Managing traffic systems assets and resources
    March 9, 2021
    The next generation Transportation Management Systems (TMSs) and their Centres (TMCs) offer agencies the potential to improve safety and mobility