Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Colorado river bridge relieves congestion
    February 7, 2012
    Built in the shadow of the Hoover Dam, a new bridge is set to takes its place as another major tourist attraction. Patrick Smith reports
  • Metrostav, SATRA, SHP win Libeň Bridge work
    December 28, 2023
    The 370m-long Cubist -style Libeňský Most over the river Vltava in the Czech capital Prague was opened in 1928 and connects the city quarters of Holešovice and Libeň.
  • Liebherr extends rough terrain crane range
    April 9, 2018
    Unveiled at ConExpo 2017, Liebherr has extended its mobile crane product range with an additional series of rough terrain cranes in the 90tonne and 100tonne classes. The new rough-terrain crane LRT 1090-2.1 is said to feature high performance, safety and comfort. The VarioBase (variable support base) developed by Liebherr, which allows each individual outrigger beam to be extended to optional lengths, is standard on the LRT cranes. The crane model is powered by a Cummins diesel engine which develops 194kW
  • Poetry in motion
    August 9, 2018
    A heavy-lift operation by Roll-iT using Enerpac equipment delivered a bridge deck - with a poem engraved on the underside - to Antwerp’s old harbour Only when the deck of the new Londenbrug Bridge is raised do travellers see the poem by Antwerp poet Stijn Vranken. It is written large on the underside of the 300tonne prefabricated steel deck. People waiting for a ship to pass the raised bridge now contemplate the poem’s message about ships transporting goods and people to and from the four corners of the