Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Wolffkran leads the pack
    December 10, 2024
    At present, the two WOLFF 7534.16 Clear cranes are drawing a lot of attention near Horb in Germany’s Neckar Valley
  • Arup, Mabey launch Pedesta, a modular glass-fibre polymer bridge
    May 22, 2018
    Arup and Mabey have launched what they claim is the first modular glass-fibre reinforced polymer footbridge, with Mabey becoming the first licensed distributor. Based on a concept by engineering design company Arup, Mabey debuted the bridge, called Pedesta, at Bridges 2017, a one-day conference and exhibition in the English city of Coventry in March. The Mabey Group specialises in the design and provision of temporary works including propping and jacking as well as environmental monitoring services, formw
  • Royal treatment for Hull’s Princes Quay Bridge
    January 30, 2020
    Finishing touches are being put on Princes Quay Bridge in the northern English city of Hull, in East Yorkshire county, for opening this spring.
  • Elevated thinking
    July 30, 2019
    A Swiss-designed system for the diversion of traffic away from road maintenance crews could be revolutionary, reports David Arminas Switzerland will soon tender for companies to build and supply a mobile system for physically shifting traffic away from bridge and road maintenance crews. The federal highways agency - FEDRO - will be asking manufacturers of heavy equipment to submit bids starting this summer for the Astra Bridge system. The system will be two lanes wide and include ramp sections at e