Skip to main content

A Grove GMK4100L installs a footbridge across Ortigas Avenue

Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines. Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operati
July 4, 2019 Read time: 2 mins
A Grove in a groove above Ortigas Avenue in Pasig City
Steel Centre Philippines, a specialist steel design, fabrication and erector, has used a Grove GMK4100L all-terrain crane to install a 28m footbridge in the Philippines.


Working for the local Metropolitan Manila Development Authority, a government agency, the company positioned the 20tonne bridge in only 30 minutes. The new footbridge sits in Ortigas Avenue, a major thoroughfare in Pasig City, located in Eastern Manila, where it serves as a walkway for pedestrians, said Irvin Ong, vice president of operations for Steel Centre Philippines. “The GMK4100L handled the bridge project with ease.”

Steel Centre has two GMK4100L all-terrain cranes, one GMK3055 all-terrain crane, plus an RT760 rough-terrain crane. The GMK4100L cranes are working on other projects for the company. One is constructing a new subway station while the other is working on the Athletic Stadium in New Clark City. The new stadium is expected to feature in the upcoming 30th South East Asian Games this November.

The 100tonne capacity GMK4100L has a 60m main boom that can extend to a maximum height of 89m when working with its jib. It has been replaced in the Grove line by the new generation GMK4100L-1. This unit has the same 10tonne capacity and 60m main boom, but is more compact than its predecessor and has greater flexibility in configuration.

Related Content

  • Bahrain –based firm equipping with Terex Cranes
    February 8, 2018
    The Bahrain-based Sarens NASS Middle East WLL group is boosting its fleet with the addition of 15 new Demag AC-130-5 all-terrain cranes. The firm already has several new Demag all-terrain cranes in its fleet, according to Alhanoof Nass, director of Sarens NASS Middle East. The Demag AC 130-5 all-terrain cranes Sarens ordered feature five axles and are said to be compact for the 130tonne capacity class. The units feature a total length of 14.3m and a carrier width of 2.75m. The cranes also have a standard
  • Manitowoc crane helps construct new Illinois bridge
    December 15, 2017
    A barge-mounted crane from Manitowoc is playing a key role in a major Illinois bridge replacement project. The machine is being used by Kraemer North America, which is replacing an 84-year-old truss bridge near Savanna, Illinois. The firm is employing a barge-mounted MLC300 equipped with the sophisticated variable position counterweight (VPC) technology, which is said to allow the MLC300 to adjust its counterweight during each lift and keep the barge stable while lifting. When Manitowoc introduced its VPC
  • All-terrain crane additions to ILC fleet
    May 18, 2018
    A key logistics provider in the Middle East, Integrated Logistics Company (ILC), has bought the first two Demag AC 300-6 all-terrain cranes from Terex Cranes. ILC says that it plans to put the cranes to work at several jobsites throughout the Gulf region. The new six-axle Demag AC 300-6 all-terrain crane offers a 300tonne maximum lifting capacity and features an 80m main boom. This new six-axle Demag all terrain crane is said to offer versatility needed for carrying out demanding jobs for lower operational
  • Building Norway's longest suspension bridge
    March 2, 2012
    AT 1.38KM LONG, the new €213 million Hardanger Bridge crossing Hardangerfjord, Norway's second largest fjord, will be the country's longest suspension bridge. The structure, designed by Norway's Forum Arkitekter, will be a new landmark with its 200m high concrete towers and steel construction.