Skip to main content

GEWI piles for Blankenburg Connection

BAUER Funderingstechniek is installing GEWI micropiles with threads as part of Rotterdam’s new 4km-long A24 highway that includes two tunnels under the Scheur River
June 17, 2020 Read time: 2 mins
BAUER is installing the deepest GEWI piles in the Netherlands to date

The work by BAUER Funderingstechniek - the Dutch subsidiary of German parent firm BAUER Spezialtiefbau - is for the Blankeburgverbinding (Blankenburg Connection) tunnel project west of the city between the A15 and A20 highways.

Rotterdam, with a population of around 650,000, is the second largest city in the Netherlands and Europe's largest seaport, making it an important freight transport hub. The Blankenburg Connection will relieve truck and general traffic congestion.

BAUER has been delivering GEWI material to the site since July 2019 and by May is due to have installed 4,500 piles. But preliminary pile load tests were conducted in 2018 to investigate the primary friction properties of the three soil strata at the site. Soft clay, followed by firm clay and medium-dense to dense layers of sand were detected down to a depth of up to 20m.

The design of the GEWI piles for the tunnel ramps was adjusted based on the results of the pile load tests. Installation of the pile foundation for the southern ramp of the future 30m-deep Maas Delta Tunnel began last summer.

"In total, 11 teams with 11 KLEMM KR 806 rigs are currently being used in the joint project with our partner De Vries Titan," said Maarten Daalmeijer, project manager at BAUER Funderingstechniek. "This way we are sure to keep to the tight schedule.”

BAUER is installing the deepest GEWI piles in the Netherlands to date. Penetration of 64m below the NAP (Normaal Amserdams Peil - Amsterdam Ordnance Datum) -  a height reference point for the Amsterdam water level.

For more information on companies in this article

Related Content

  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Cut and cover consolidation
    July 10, 2012
    Foundation specialist Forasol has developed an innovative technique for anchor drilling that is improving ground consolidation on road projects in Switzerland. The technique has been widely used on a number of highway projects in the country, including construction of a new 1.3km long cut-and-cover trench for the A9 highway in south western Switzerland.
  • $1.49 billion for Oregon-Washington bridge
    August 26, 2024
    The existing Interstate 5 bridge connecting Portland and Vancouver over the Columbia River in the US northwest is actually two parallel bridges – one dating back to 1917.