Skip to main content

GEWI piles for Blankenburg Connection

BAUER Funderingstechniek is installing GEWI micropiles with threads as part of Rotterdam’s new 4km-long A24 highway that includes two tunnels under the Scheur River
June 17, 2020 Read time: 2 mins
BAUER is installing the deepest GEWI piles in the Netherlands to date

The work by BAUER Funderingstechniek - the Dutch subsidiary of German parent firm BAUER Spezialtiefbau - is for the Blankeburgverbinding (Blankenburg Connection) tunnel project west of the city between the A15 and A20 highways.

Rotterdam, with a population of around 650,000, is the second largest city in the Netherlands and Europe's largest seaport, making it an important freight transport hub. The Blankenburg Connection will relieve truck and general traffic congestion.

BAUER has been delivering GEWI material to the site since July 2019 and by May is due to have installed 4,500 piles. But preliminary pile load tests were conducted in 2018 to investigate the primary friction properties of the three soil strata at the site. Soft clay, followed by firm clay and medium-dense to dense layers of sand were detected down to a depth of up to 20m.

The design of the GEWI piles for the tunnel ramps was adjusted based on the results of the pile load tests. Installation of the pile foundation for the southern ramp of the future 30m-deep Maas Delta Tunnel began last summer.

"In total, 11 teams with 11 KLEMM KR 806 rigs are currently being used in the joint project with our partner De Vries Titan," said Maarten Daalmeijer, project manager at BAUER Funderingstechniek. "This way we are sure to keep to the tight schedule.”

BAUER is installing the deepest GEWI piles in the Netherlands to date. Penetration of 64m below the NAP (Normaal Amserdams Peil - Amsterdam Ordnance Datum) -  a height reference point for the Amsterdam water level.

For more information on companies in this article

Related Content

  • Bauer’s BG 30, part of the rig manufacturer’s ValueLine platform
    January 6, 2017
    Bauer Maschinen is presenting a new generation of its ValueLine, a medium-sized platform range for bored piles with a diameter of up to 2.5m and a drilling depth of up to 70m. The platform range includes the BG 26 as the lowest priced-model and the larger version, the BG 30. The core element of the medium-sized platform range is the joint BT base carrier, which was entirely designed and constructed by Bauer. The modern and highly functional support does not just score points for its high safety standa
  • German minister oversees huge Herrenknecht TBM tunnel deal for Wuhan, China
    April 28, 2014
    German Minister of Economy and Energy, Sigmar Gabriel, attended the signing of a prized contract for the delivery of two Herrenknecht tunnel boring machines (TBM) for a large multi-functional tunnel in the Chinese city of Wuhan.
  • New EU-Russian highway connection
    February 18, 2013
    Among the forests and lakes of Finland, one of Europe's newest motorway links is being built as a Green highway linking Europe to Russia - Adrian Greeman reports The road eastwards from Finland's capital Helsinki, along the north coast of the Gulf of Finland, has not carried heavy traffic volumes, at least until recent times. Highway seven as it is designated locally, or E18 in European nomenclature, is partly motorway but in some sections still dual carriageway or even just a single lane each way, finishin
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year