Skip to main content

Flexible under-bridge inspection unit

Barin has exported its ABC 60/L skid unit machine to Brazil for use in bridge inspections in the South American country. The machine, which has an under bridge working length of 6m, has been mounted on a two-axle Iveco Daily 70C16 truck chassis by a Barin technician based in Brazil. Supplied to Rentavale Equipamentos LTDA, based in Sao Paulo, the ABC 60/L is made of aluminium alloy and has fixed and sliding elements, the latter extending up to 6,000mm horizontally whilst under bridge. Its platform width is
March 21, 2012 Read time: 2 mins
Barin’s skid unit is carrying out valuable duties on site in Brazil

Barin has exported its ABC 60/L skid unit machine to Brazil for use in bridge inspections in the South American country.

The machine, which has an under bridge working length of 6m, has been mounted on a two-axle 2409 Iveco Daily 70C16 truck chassis by a Barin technician based in Brazil. Supplied to Rentavale Equipamentos LTDA, based in Sao Paulo, the ABC 60/L is made of aluminium alloy and has fixed and sliding elements, the latter extending up to 6,000mm horizontally whilst under bridge. Its platform width is 1,000mm and the machine has a 300kg payload platform.

In addition, the ABC 60/L can work on pedestrian paths of up to 1.7m in width and in wind barriers below 2.1m. The unit can work parallel to the bridge axis, with an under bridge rotation of 135°. In highway service, the machine occupies only one traffic lane.

For more information on companies in this article

Related Content

  • Building Egypt's world class Desert Highway
    May 3, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    April 13, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports. The work to upgrade the Desert Highway connecting Egypt's sprawling capital Cairo with its major port Alexandria, is one of the country's largest infrastructure projects for many years. This 220km highway link is being widened and improved to cope with the hugely increased traffic volumes resulting partly from Egypt's fast growing vehicle population. The Egyptian economy is strong
  • Building Egypt's world class Desert Highway
    February 9, 2012
    A huge highway upgrade project will transform the Cairo-Alexandria road link into a world-class connection as Mike Woof reports
  • The Rollsroller Traffic 600/145T is a sign of the times
    April 4, 2018
    The Rollsroller Traffic flatbed mounting and lamination applicator, from Swedish sign maker Rollsroller, is designed specifically for high-volume production of road signs It has a special profile bed adjustable to fit almost any extruded guide sign panels, according to the manufacturer. Bed length for the Rollsroller Traffic 600/145T model is 6,000mm and width is 1,450mm. The pneumatically controlled roller is automatically adjusted for substrates up to 60mm. The adjustable aluminium profile bed is desig