Skip to main content

Eliminating leaks on Prague bridge

Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague. Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair
July 17, 2012 Read time: 2 mins
2314 Stirling Lloyd's Eliminator waterproofing system, found on the decks of many of the world best known highway bridges, is being used in a €8.7 million refurbishment project on the famous 650-year-old Charles Bridge in the Czech capital Prague.

Work on the tourist attraction includes repairs to the upper bridge section, replacement of the old concrete deck, installation of the new waterproofing system, replacing stones in sills where required, new drainage and repair to the structures pillars. It will repair damage caused by the weather, wear from many thousands of tourists and the floods of 2002.

The Eliminator system, which will replace the existing leaking traditional waterproofing system, is based on advanced methyl methacrylate (MMA) technology that enables it to be applied in a wide range of temperatures and climatic conditions. Stirling Lloyd's authorised contractor HELIFIX arrived on site in December 2007, and refurbishment of the 4,500m2, 516m long deck is programmed to be completed by December.

The old concrete deck and previous waterproofing system is being removed and replaced by a new concrete deck. It is then primed with Stirling Lloyd's MMA based primer, PAR1 primer, that seals the concrete, and the Eliminator waterproofing membrane is spray applied in two separate coats. Stirling Lloyd's Metaset structural adhesive is applied, and while still tacky, the drainage geotextile is placed, followed by 100mm of concrete and the original numbered paving stones.

For more information on companies in this article

Related Content

  • Speedy repair for key UK motorway
    October 2, 2014
    Major road repairs have been carried out on the UK’s busy M25 motorway. Stirling Lloyd's Safetrack Crack Infill is helping to reinstate major sections of London's M25 orbital motorway.
  • Cost-effective cold mix asphalt recycling
    February 17, 2012
    In Lithuania, cold mix asphalt containing recycled asphalt pavement has been installed in a new base course overlay for a section of the A1, the country's most heavily trafficked motorway.
  • Bridge formwork solutions complete big bridge picture
    July 2, 2014
    Advanced bridge formwork solutions are allowing contractors to complete vital major highway infrastructure projects covering Norway, Sweden, Estonia and Poland. Guy Woodford reports Building the Labbdalen bridges in Norway is a key feature of the E6 highway improvement programme. Main project contractor HÆHRE tasked RMD Kwikform and Teknikk with supplying a complete formwork and shoring solution that could tackle the challenging Norwegian terrain, whilst preserving the environment. Situated two hours
  • Major Pisa link gets upgrade
    February 29, 2012
    Recycling with foamed bitumen is being used for lane reconstruction on the SP11 road in Italy, where contractor F.lli Lepri is carrying out work on a 14km section. The SP11 is an important link forming part of the Colline per Legoli Highway connecting the SS67 Tosco-Romagnola Highway near Pontedera with the southeast region of Pisa Province up to the borders of Florence Province.